My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/10/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 09/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:33:33 PM
Creation date
9/11/2019 4:04:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/10/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
834
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Geotechnical Services <br />20-01 Variolite Street Reconstruction <br />Ramsey, Minnesota <br />NTI's engineers are also available to provide geotechnical guidance to the design team, evaluate value <br />engineered alternatives, review earthwork, groundwater control, and other civil plans and specifications as an <br />additional service. NTI's engineers, special inspectors and technicians are available to provide construction and <br />materials testing services once the project construction begins. This provides professional continuity of services <br />throughout the design and construction of the project. <br />DELIVERABLES <br />NTI will provide an electronic PDF copy of the final report to the client. Two bound hard copies are available <br />upon request. <br />COST <br />We will perform the base geotechnical exploration and report described above in accordance with the attached <br />proposal bid form. <br />Our fees assume that the soil can be disposed of on site, such as by thin spreading near the borehole. Additional <br />fees may apply for handling the spoils or for containerizing (drumming) spoils. Environmental hazard testing may <br />be required for disposal to a landfill, if needed. <br />NTI's fees assume that the work may be performed with standard construction Personal Protective Equipment <br />(PPE), including hard hats, safety glasses, hearing protection and visibility equipment such as vests. If additional <br />PPE is required, such as for drilling in an environmentally contaminated area or in a confined space, additional <br />fees will apply. <br />SCHEDULE <br />Upon receiving authorization to proceed, the field work will typically begin in approximately 10 to 15 business <br />days and will take approximately 5 days to complete. The report will be issued to you within 7 to 10 business <br />days of completion of the field work. Boring logs and verbal information regarding our findings can be provided <br />within 2 to 3 days after the field work has been completed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.