My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/10/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 09/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:33:33 PM
Creation date
9/11/2019 4:04:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/10/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
834
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
working hours. Traprock Commons Park located at 15650 Traprock Street, has access to Variolite <br />Street and is available for staging. <br />TRAFFIC CONTROL: Work shall be conducted in conformance with the specifications set forth <br />herein and in accordance with the Minnesota Department of Transportation Standard <br />Specifications for Construction, 2018 Edition, which is incorporated by reference to these <br />specifications. <br />PAYMENT: Payment will be made upon submittal of an invoice to the City on a net 30 day basis <br />following City acceptance of the work. An IC 134 form will be required prior to final payment. <br />BASIS OF PAYMENT: Payment shall be made for the work on the basis specified below. The <br />cost of any additional labor, materials, permits, tools and supplies which have not been specifically <br />identified in this section for payment, but required to complete the project as per the plans and <br />specifications shall be considered incidental to the project. <br />1. Mobilization — Payment shall be made on a lump sum basis for the mobilization of equipment. <br />2. Geotechnical Report — Payment shall be made on a lump sum basis as compensation for all <br />development of the geotechnical report meeting the requirements outlined in this RFP. <br />3. Soil Boring — Payment shall be made on a per each basis as compensation for all equipment, <br />material and labor costs required for the soil boring and all required documentation of soil borings <br />as outlined in this RFP. <br />4. Soil Boring Additional Depth —Payment shall be made on a per lineal foot basis as compensation <br />for all equipment, material and labor costs required for soil boring at depth beyond 10-feet. The <br />cost of meeting any Minnesota Department of Health requirements for abandonment of <br />geotechnical soil bore holes, including holes deeper than 15-feet are incidental to this pay item. <br />5. Traffic Control —Payment shall be made on a lump sum basis as compensation for all equipment, <br />material, and labor costs required for the installation and maintenance of traffic control measures <br />(signage, barricades, flashers, flaggers, etc.), as directed by the Engineer, for any local traffic <br />disruptions or temporary closures. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.