Laserfiche WebLink
Ramsey (1020035) <br />Public Water Supplier: <br />12/15/2017 <br />Date: <br /> <br />If yes, what information new information is available that may change the DWSMA <br />vulnerability assessment? <br /> (Check all that apply) <br />Updated soils or geological information <br /> Updated water quality data from within the DWSMA <br /> Updated inventory of current and historical land uses <br /> Other (specify) <br /> <br />Note: If DWSMA vulnerability changes, you may still use the EZ amendment form. If the <br />change is to a single vulnerability rating that covers the entire DWSMA, this can be addressed in <br />the text. If the new DWSMA vulnerability is variable, it must be shown in a figure that is <br />attached to the report form. <br /> <br />Step 14 <br /> Is the existing Part 1 WHP plan (i.e., documentation of the delineations and the <br />vulnerability assessments) adequate so that only changes to the WHPA and DWSMA need be <br />addressed? <br /> No, the Part 1 report must be brought up to current standards. <br /> Yes, any changes to the WHPA, DWSMA or delineation criteria can be addressed by <br />using the EZ amendment template. <br /> <br /> <br />Step 15 <br /> Is the assessment of data elements conducted for the previous documentation effort <br />still valid? <br /> <br /> No, the assessment of data elements must be brought up to current standards. Attach <br />the data elements assessment table to this document and proceed to use the EZ <br />amendment template. <br /> Yes, any changes to the WHPA, DWSMA or delineation criteria can be addressed by <br />using the EZ amendment template. <br /> <br /> <br />Form completed by <br /> <br />Hydrologist: Amal Djerrari <br /> <br /> <br />9 <br />V1.0 2/2013 <br /> <br />