My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/21/2002
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2002
>
Agenda - Public Works Committee - 05/21/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:53:05 PM
Creation date
5/12/2003 10:40:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/21/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Update to Highlands at River Park <br />By: Brian Olson, Principal City Engineer <br /> <br />P.W. CASE # I <br /> <br />Background: <br /> <br />The propose of this case is to give you an update on the implementation of Highlands at River <br />Park and give the people along Alpine Drive an opportunity to speak. Since the Highlands at <br />River Park will affect Alpine Drive between Trunk Highway 47 and Roanoke Street NW, we <br />asked the Developer to send a notification (attached) to the residents along Alpine Drive to <br />inform them of the reason for the disruption as well as give them an opportunity to speak about <br />the project. <br /> <br />The original plan to extend sewer and water to this subdivision indicated that the sanitary sewer <br />was to be located 3 feet from the north curbline on Alpine Drive. In an effort to save as many <br />trees and landscaping as possible we shifted the alignment of the sewer (which is 18 feet deep) 6 <br />feet to the south. The Contractor has agreed to install trench boxes for the first 12 feet of depth to <br />minimize the amount of disruption. <br /> <br />One lane of traffic will be maintained throughout the process except while the crossings are made <br />in the street at Barium Street NW, Zuni Street NW and Yakima Street NW. During the <br />installation of these crossings, the road will need to be closed, for a period of a day per crossing. <br />The Contractor has agreed to restrict his hours of operation during these crossings and all <br />construction activity on Alpine Drive to 9:00 a.m. - 4:00 p.m. <br /> <br />The Contractor has requested that construction activity be allowed before school ends. Staff feels <br />that pedestrian safety is a must and has required that no construction activity occur until after <br />schools lets out. The Contractor may be present at the meeting to discuss this request. <br /> <br />Action: <br /> <br />Based upon discussion <br /> <br />Reviewed by: <br /> <br />Director of Public Works <br />Finance Officer <br /> <br />PW: 05/21/02 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.