My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/08/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 10/08/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:34:30 PM
Creation date
10/9/2019 8:41:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/08/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 5. 4. <br />Meeting Date: 09/17/2019 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Recommend City Council Approval of Germanium Street Drainage Improvements, Improvement Project # 19-09 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to recommend City Council approval of Germanium Street Drainage Improvements, <br />Improvement Project #19-09. <br />Background: <br />The property owner at 17310 Germanium Street informed Staff in 2017 that stormwater runoff from Germanium <br />Street runs into his front yard and ponds there, even though there is no drainage easement. He also noted that his <br />septic system is in this general area as well. <br />Bolton & Menk collected topographic survey data this summer and City Staff is in the process of preparing draft <br />plans, specifications and cost estimates to construct a small retaining wall at the outside edge of the City's <br />right-of-way so stormwater runoff can be contained within the right-of-way west of Germanium Street. This will <br />prevent the City from needing to acquire easements. <br />Staff is proposing to bid the project this fall/winter in hopes of receiving better bids based on the time of year, and <br />based on bidding numerous projects at the same time. Staff will present the draft plans and cost estimate during the <br />Public Works meeting. <br />Timeframe: <br />Staff estimates approximately 5 minutes will be required for presentation and discussion of this case. <br />Observations/Alternatives: <br />Observations: <br />Staff plans to request City Council approval of plans and specifications and authorization to advertise for bids on <br />September 24th. Construction is proposed to be substantially complete this fall or winter, and complete by June 30, <br />2020. <br />Alternatives: <br />Alternative # 1: Motion to recommend City Council approval of Germanium Street Drainage Improvements, <br />Improvement Project #19-09. <br />Alternative #2: Motion of other. <br />Funding Source: <br />Staff is finalizing plans and estimated costs and will present these during the meeting. Project costs are proposed to <br />be split evenly between Stormwater Management and Stormwater Utility Funds. <br />Recommendation: <br />Staff recommends alternative # 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.