Laserfiche WebLink
Public Works Committee 5. 5. <br />Meeting Date: 09/17/2019 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Recommend City Council Approval of Hedgehog Street Drainage Improvements, Improvement Project #19-10 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to recommend City Council approval of Hedgehog Street Drainage Improvements, <br />Improvement Project #19-10. <br />Background: <br />The property owner at 15639 Hedgehog Street informed Staff in 2018 that stormwater runoff from Hedgehog Street <br />and 156 th Lane NW runs through a ditch on their property but lately the runoff is extending outside the easement <br />area to within about 10 feet of the back door. The property owner inquired what the City could do to help prevent <br />stormwater runoff from ponding in their back yard. <br />City Staff collected topographic survey data in late 2018 and early 2019, and is now preparing draft plans, <br />specifications and cost estimates for a drainage improvement project that includes re -grading the existing drainage <br />swale along the south property line of 15639 Hedgehog Street, directly across from 15611 Lane NW. The ditch and <br />proposed grading improvements are located within an existing drainage easement that front several properties in the <br />area. The City will not need to acquire easements to complete this work. <br />Staff is proposing to bid the project this fall/winter in hopes of receiving better bids based on the time of year, and <br />based on bidding numerous projects at the same time. Staff will present the draft plans and cost estimate during the <br />Public Works meeting. A copy of the draft title sheet from the plans is attached for reference <br />Timeframe: <br />Staff estimates approximately 5 minutes will be required for presentation and discussion of this case. <br />Observations/Alternatives: <br />Observations: <br />Staff plans to request City Council approval of plans and specifications and authorization to advertise for bids on <br />September 24th. Construction is proposed to be substantially complete this fall or winter, and complete by June 30, <br />2020. <br />Alternatives: <br />Alternative # 1: Motion to recommend City Council approval of Hedgehog Street Drainage Improvements, <br />Improvement Project #19-10. <br />Alternative #2: Motion of other. <br />Funding Source: <br />Staff is finalizing plans and estimated costs and will present these during the meeting. Project costs are proposed to <br />be split evenly between Stormwater Management and Stormwater Utility Funds. <br />Recommendation: <br />