Laserfiche WebLink
Mr. Bruce Westby, P.E. <br />April 10, 2019 <br />Page 2 <br />April 4, 2019 Scoping 2 Decision Notice from the MDH that you provided to John Greer of Barr via email. <br />The Scoping 2 Decision Notice specifies that the Part 2 WHPP amendment must be submitted to MDH by <br />October 6, 2019. <br />Scope of Work Tasks and Assumptions <br />Barr Engineering's proposed scope of work is presented below. <br />Task 1: Wellhead Protection Plan Part 2 Preparation <br />Barr Engineering will prepare, in consultation with the City, an initial draft of the Part 2 WHPP amendment <br />to meet the requirements of the Wellhead Protection Rules. When complete, the draft plan will be sent to <br />you for City review. After addressing any City comments on the initial draft, Barr will provide a copy of the <br />draft Part 2 WHPP amendment via electronic means (i.e., email or ftp site) to the MDH for preliminary <br />review. <br />The Wellhead Protection Rules require that potential contaminant sources within a DWSMA be <br />inventoried. Types of potential contaminant sources that must be inventoried depend upon the aquifer <br />vulnerability classification(s) within the DWSMA. It is our understanding that the aquifer vulnerability <br />classification in both of the City's newly delineated DWSMAs is "moderate". It is also our understanding <br />that the MDH will require that potential contaminant sources within the DWSMA be inventoried according <br />to Department guidance for DWSMAs with this aquifer vulnerability classification. Identification and <br />verification of these locations is known as a potential contaminant source inventory (PCSI). It is possible <br />that not all potential contaminant source types that MDH guidance identifies to be inventoried are <br />present in the DWSMAs. <br />After the draft Part 2 WHPP amendment, including PCSI, is completed and reviewed by the City, it will be <br />submitted to the MDH for preliminary review. Barr Engineering will review any MDH comments that come <br />from the Department's preliminary review of the draft Part 2 WHPP amendment. Typically, any comments <br />we receive on a draft Part 2 WHPP can be easily addressed. We will discuss the MDH comments with City <br />staff and make any necessary changes to the draft that result from MDH comments. Per your discussion <br />with John Greer, Barr Engineering will, on behalf of the City, send copies of the draft Part 2 Plan to local <br />governmental units (LGUs) whose jurisdictions overlaps the DWSMAs. Please note that the Wellhead <br />Protection Rules require that the LGUs be given 60 days to review the draft Part 2 Plan. <br />Barr Engineering will address, in consultation with the City, any comments received from the LGUs and <br />prepare a final Part 2 WHPP amendment. Following the LGU review and prior to submittal of the Part 2 <br />WHPP amendment to the MDH for approval, the City must hold a Public Hearing on the WHPP. We have <br />assumed that John Greer of Barr Engineering will attend the Public Hearing to discuss the Part 2 WHPP <br />amendment. <br />