My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/08/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 10/08/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:34:30 PM
Creation date
10/9/2019 8:41:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/08/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sampling of City wells for tritium and the indicator parameters at regular intervals will allow for tracking of <br />concentrations over time. If concentrations of these monitoring parameters in a groundwater sample from <br />a well are significantly higher than the concentrations in a previous sample from the same well it could be <br />an indication that there is a pathway such as a leak in the well casing or an unused, unsealed well in the <br />vicinity that allows water to move from the surface to the source water aquifer faster than before the <br />pathway became available. The City will work with the MDH to sample Wells 1, 3, 4, 6, and 7 in year five <br />after approval of this WHPP. Thereafter, the City will work with the MDH to sample the municipal wells for <br />these parameters at least every 10 years. The City recognizes that, contingent on funding, the MDH will <br />provide sample bottles and cover analytical costs but City staff may be required to perform the sample <br />collection and ship samples to the MDH. <br />7.7.6.1 Source of Action <br />City staff <br />7.7.6.2 Cooperators <br />MDH <br />7.7.6.3 Time Frame <br />In year five after approval of this WHPP and then at least every 10 years thereafter. <br />7.7.6.4 Estimated Cost <br />At the time this plan was prepared, cities were not charged by the MDH for tritium and indicator <br />parameter sampling and analysis. <br />7.7.6.5 Goals Achieved <br />Obtaining data to evaluate if pathways that allow for relatively rapid movement of water from the surface <br />to the source water aquifers are present. <br />Success criterion: Collection of groundwater samples from the selected City wells and analysis of these <br />samples for tritium and the indicator parameters on the schedule outlined in section 7.7.6.3. <br />7.7.7 Evaluation of Well 1 Casing <br />In the Part 1 WHPP amendment (MDH, 2018) it was noted that the tritium concentration in a groundwater <br />sample collected from Well 1 in 2017 was higher than the tritium concentration in a sample collected from <br />the well in 2006. The rise in tritium concentration could be an indication of a leak in the well casing. <br />Therefore, the City will hire a well contractor to evaluate the condition of the casing during the next <br />scheduled maintenance of the well. <br />7.7.7.1 Source of Action <br />City staff <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.