My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/08/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 10/08/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:34:30 PM
Creation date
10/9/2019 8:41:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/08/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Background <br />The existing water supply source for the City of Ramsey's water supply system is the Tunnel City/Wonewoc <br />(TCW) aquifer, formerly known as the Franconia -Ironton -Galesville (FIG) aquifer. Water is drawn from the <br />TCW aquifer through eight (8) groundwater wells, seven (7) of which are currently being utilized to provide <br />potable water. The maximum capacity of the combined municipal wells is 10.9 million gallons per day <br />(MGD). Two additional wells are proposed to be constructed in the years 2023 and 2028, which is intended to <br />supply water to all municipal water system users to the year 2040 based on projected City growth. <br />The City's groundwater supply wells have historically provided groundwater of good quality and in adequate <br />quantity. However, in 2019 the Minnesota Department of Health informed the City that several of its <br />groundwater supply wells are producing concentrations of manganese that exceed the recommended Secondary <br />Drinking Water Standards. The City does not currently treat its municipal water supply for manganese so as a <br />short-term solution the City immediately started pumping water only from the three wells with the lowest <br />concentrations of manganese to maintain manganese concentrations below the recommended Secondary <br />Drinking Water Standards. Unfortunately, these wells also produce the highest concentrations of iron, which <br />has resulted in increased complaints of rust -colored water, and will damage system components over time. <br />To properly plan for long-term solutions to reduce manganese and iron concentrations in the municipal water <br />supply system, and to confirm the existing water supply source has adequate capacity, the City is requesting <br />proposals from qualified consultants for providing professional services as generally outlined in the Scope <br />of Services section, and as further identified under the Specific Requirements section. <br />Final design work for the centralized water treatment facility, including any pilot testing of preferred treatment <br />processes, will be completed under separate contract using information from the preliminary design report. <br />Questions regarding this request for proposals shall be directed to City Engineer Bruce Westby at 763-433- <br />9825 or bwestby@cityoframsey.com. <br />Special Considerations <br />I. Neighboring Property Impacts. The preliminary design report shall explore potential impacts <br />of the water treatment facility on neighboring properties due to noise, odors, operating hours, <br />traffic, and other identified sources of impact, and recommend a process for mitigating any <br />identified impacts during the final design process. <br />2. Estimated Costs. The preliminary design report shall include estimated construction and operating <br />costs for the groundwater treatment facility over the anticipated life of the facility. Estimated <br />costs shall assume industry standard costs for a water treatment facility, and shall include at least <br />one laboratory/office space, one medium-sized conference room, and one two -bay garage with a <br />storage mezzanine The garage is anticipated to house a portable generator and miscellaneous <br />utility equipment/vehicles, whose costs shall NOT be considered within the cost estimate. <br />3. Budget. The preliminary design report shall explore future budget impacts based on estimated <br />construction and operating costs, and shall explore and recommend water rate revisions needed <br />to offset future budget impacts. <br />4. Public Education/Engagement Plan. The preliminary design report shall include a public <br />education/engagement plan designed to clearly and concisely convey the preliminary design report <br />results to the public, and to allow for public feedback. Public feedback will help the City to understand <br />potential concerns related to the recommended facility, including the recommended site and/or <br />treatment processes, which can then be addressed during fmal design of the facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.