My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/08/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 10/08/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:34:30 PM
Creation date
10/9/2019 8:41:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/08/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT EXPERIENCE // SIMILAR PROJECTS AND REFERENCES <br />\iiter Tretmet Plant <br />APPLE VALLEY, MN <br />Over the past 27 years, SEH team members have worked <br />with the City of Apple Valley on their water treatment facility <br />needs. Beginning in 1988, Miles Jensen delivered design <br />and construction engineering services for the 12 mgd iron <br />and manganese removal water treatment plant. In 1998, <br />Miles served as project manager for an automated filter <br />bypass that extended capacity of the facility to 17.5 mgd <br />with blending. He also worked with the City on several <br />miscellaneous projects and investigations related to their <br />water treatment plant since its construction. <br />Currently, Miles is the program manager and Chris <br />Larson the design engineer providing planning, design <br />and construction services required to expand this iron <br />and manganese removal plant to 24 mgd. Improvements <br />include the addition of four concrete gravity filter with 6.5 <br />mgd filtration capacity, two additional backwash tanks, <br />upgrades to the existing filters and inlet distributors, adding <br />a 15,000 square foot utility garage and shop and a municipal <br />car wash. Remodeling and upgrades to the existing water <br />treatment plant and offices were also included. <br />REFERENCE Carol Blommel Johnson <br />Utilities Superintendent <br />952.953.2441 <br />SEH TEAM Miles Jensen I Project Manager <br />Chris Larson I Sr. Project Engineer <br />FribuIt Water Treatment Plant <br />FARIBAULT, WI <br />The City of Faribault has five water supply wells with <br />elevated concentrations of iron. The City of Faribault <br />recently had to replace all of its residential flow meters <br />due to iron buildup. In addition to water quality concerns, <br />some of Faribault's water infrastructure is old and in <br />need of replacement including a 2 MG concrete reservoir <br />constructed in the 1920s and a pumping station constructed <br />in the 1930s. <br />In 2015, to assess the existing infrastructure and to evaluate <br />options for removing iron from their drinking water, the <br />City of Faribault hired SEH to prepare a water treatment <br />plant feasibility report. The feasibility report identified that <br />a pressure filter treatment plant would be a better option <br />for Faribault due to high groundwater at the site and cost <br />considerations. In 2018, SEH performed the detailed design <br />of the water treatment plant. The project included design of <br />a cost effective 8 MGD horizontal pressure filter treatment <br />plant. The design includes demolishing the existing 2 MG <br />reservoir and increasing the pressures of the 5 existing wells. <br />This design provides a more efficient and operator friendly <br />process. The water treatment plant is currently under <br />construction. <br />REFERENCE Travis Block <br />Public Works Director <br />507.333.0365 <br />SEH TEAM <br />Chris Larson I Project Manager <br />Nick Brula I Mechanical Engineer <br />Chad Westbrook I Electrical Engineer <br />19 CENTRALIZED WATER TREATMENT FACILITY PROPOSAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.