Laserfiche WebLink
Personnel Qualifications and ReIevDt Experience <br />Chris Larson PE <br />PROJECT MANGER <br />Chris is a civil and environmental project manager/engineer with extensive experience <br />in development, design, construction and management of a wide variety of projects. <br />His experience covers pilot studies and testing, preliminary engineering studies, design, <br />construction administration, project management and startup and training for water <br />treatment and supply projects. Chris has also provided facility planning, design and <br />construction administration of major sanitary sewer interceptors. He serves as the engineer <br />for the Joint Powers Water Board of St. Michael, Albertville and Hanover, overseeing all of the <br />engineering aspects of a water utility. <br />• Water Treatment Plant Expansion — City of Apple Valley, MN <br />• Water Treatment Plant — City of Faribault, MN <br />• Water Treatment Plants — City of Minnetrista, MN <br />• Water Treatment Plant No.1— City of Cloquet, MN <br />• NW Metro Water Study (Metropolitan Council Environmental Services) — St. Paul, MN <br />• Gibbon Water Treatment Facility — City of Gibbon, MN <br />• Observatory Water Treatment Plant Improvements (Rivanna Water & Sewer Authority) — <br />Charlottesville, VA <br />Miles Jeiiseii PE <br />PRINCIPAL, QA/QC <br />Miles is a water treatment expert with 35 years of engineering experience as a project <br />manager, client service manager and water discipline leader. Miles specifically specializes <br />in advanced water treatment facility process design, construction management and plant <br />start-up. Miles' experience includes master planning for ground and surface water systems, <br />including enhanced coagulation, lime softening and ion exchange processes for iron, <br />manganese, arsenic, radium, volatile organic compound (VOC) removal and DBP control. <br />• Chanhassen, MN West WTP <br />Feasibility Study (8.6 MGD)* <br />• Brooklyn Center, MN WTP <br />Feasibility Study (10 MGD)* <br />• Elk River, MN Well 7 Filter <br />Addition (2.0 MGD)P* <br />• Anoka, MN Wells 6/8 WTP <br />Expansion (5.6 MGD)P* <br />• Fridley - Locke Park WTP Renovation and <br />Backwash Tank addition(2.0 MGD)P <br />• Savage, MN WTP #2 Renovation <br />and Addition (4.3 MGD)* <br />• Eau Claire, WI WTP Filter Renovation and <br />Pretreatment Expansion (30 MGD)* <br />• Sussex, WI Well 4 (1 MGD) P* WTP <br />• Sussex, WI Well 5 (1 MGD) P* WTP <br />• Sussex, WI Well 8 (2 MGD) P* WTP <br />• South Bend, IN - Pinhook WTP <br />Renovation (10 MGD)* <br />EDUCATION <br />Master of Science <br />Environmental Engineering <br />University of <br />Minnesota -Minneapolis <br />Bachelor of Science <br />Environmental Engineering <br />Michigan Technological <br />University -Houghton <br />REGISTRATIONS <br />Professional Engineer in <br />Minnesota <br />24+ <br />years of experience <br />EDUCATION <br />Bachelor of Science <br />Civil Engineering <br />University of Minnesota - <br />Minneapolis <br />REGISTRATIONS <br />Professional Engineer in <br />Minnesota, Wisconsin, <br />Michigan, Indiana, Illinois, Iowa, <br />Nebraska, North Dakota, South <br />Dakota, Colorado, and Virginia <br />35+ <br />years of experience <br />SHORT ELLIOTT HENDRICKSON INC. 26 <br />