Laserfiche WebLink
LLI <br />- <br />Q <br />CD <br />o <br />4-1 <br />N <br />0 <br />V <br />>ft <br />1_ <br />co <br />a <br />• _ <br />• _ <br />112 <br />a <br />CO <br />a) <br />N <br />E <br />co <br />fx <br />TOTAL <br />tO <br />i/I- <br />1 <br />LA <br />i/I- <br />$52 - $58 M <br />$49 - $54 M <br />N <br />tO <br />i/I- <br />tO <br />i/I- <br />r-I <br />LA <br />i/I- <br />1 <br />Cr <br />i/I- <br />Engineering <br />$6.8 - $7.6 M <br />$4.6 - $5.0 M <br />$5.5 - $6.0 M <br />2 <br />O <br />01 <br />Ni <br />00 <br />2 <br />h <br />LO <br />r-I <br />Right -of -Way <br />00 <br />LID <br />r-I <br />00 <br />LID <br />r-I <br />m <br />Ni <br />r-I <br />00 <br />LID <br />r-I <br />o <br />CO <br />r-I <br />Construction <br />$34 - $38 M <br />O <br />m <br />N <br />N <br />$41 - $45 M <br />d- <br />m <br />O <br />m <br />Ln <br />Ni <br />m <br />Ni <br />Ramsey Over Cost Estimates <br />Option 2. Tight Diamond <br />Option 4. Folded WB TH 10 Off <br />Option 7A. Overpass with RIRO <br />Option 76. Overpass with RIRO <br />Option 9. Tight Diamond with <br />Frontage Rd <br />