Laserfiche WebLink
w <br />a <br />-0 <br />a) <br />co <br />s <br />c <br />z <br />TOTAL <br />l0 <br />LA <br />in <br />LA <br />in <br />LA <br />lO <br />in <br />01 <br />LA <br />in <br />00 <br />lO <br />in <br />1 <br />l0 <br />0 <br />l0 <br />in <br />1 <br />LA <br />in <br />$34 - $38 M <br />$34 - $38 M <br />Engineering <br />$8.3 - $9.1 M <br />coin <br />N <br />tA- <br />1 <br />% -1 <br />N: <br />N <br />N <br />t/)- <br />Lf1 <br />L0 <br />00 <br />00 <br />'LA- <br />Ol <br />Ir <br />$3.8 - $4.2 M <br />$3.9 - $4.3 M <br />I <br />0 <br />I <br />= <br />t <br />aA <br />• <br />m <br />t/)- <br />1 <br />Ni <br />r-I <br />N <br />t/)- <br />1 <br />% -1 <br />r-I <br />t/)- <br />m <br />t/)- <br />1 <br />N <br />r-I <br />t/)- <br />m <br />t.n- <br />1 <br />Ni <br />r-I <br />-IA-t/)- <br />N <br />t/)- <br />1 <br />% -1 <br />r-I <br />t/)- <br />N <br />t/)- <br />% -1 <br />r-I <br />t/)- <br />Construction <br />lO <br />m <br />m <br />m <br />$40 - $44 M <br />L0 <br />- <br />r1 <br />- <br />% -1 <br />N <br />Ol <br />r-1 <br />% -1 <br />N <br />Ol <br />r-1 <br />al <br />m <br />Ln <br />m <br />Sunfish Cost Estimates <br />Option 1A. Overpass with RIRO (Over RR) <br />Option 1B. Overpass with RIRO (Over RR) <br />Option 5B. Grade Separated RAB (At Grade RR) <br />Option 6B. Center Turn Overpass (At Grade RR) <br />Option 9A. Overpass w/RIRO, Reduced Access <br />(At Grade RR) <br />Option 9B. Overpass w/RIRO, Full Access <br />(At Grade RR) <br />