My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/16/2002
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2000 - 2009
>
2002
>
Agenda - Public Works Committee - 07/16/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:53:44 PM
Creation date
5/12/2003 1:56:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/16/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.W. CASE <br /> <br />DISCUSSION OF EMERGENCY VEHICLE ACCESS ON ARGON STREET <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />During the plat approval process for the Mallard Pond subdivision it was agreed that the <br />connection of Argon Street between the Flintwood Hills 3rd addition and the Mallard <br />Pond subdivision would be limited to the passage of emergency vehicles only. Section <br />VII b of the Development Agreement states: <br /> <br />"The barrier to be located just south of Argon Street entering into the <br />Mallard Pond PUD shall be designed such that it can be easily removed in <br />times of emergencies and is subject to the approval of the City." <br /> <br />Throughout the platting process the discussion of the barrier focused on the issue of <br />vehicular traffic between the adjacent developments. As new residents took up <br />occupancy in the new development, there was a desire to also prevent pedestrian traffic <br />as well. The barrier which is now proposed by Mallard Ponds, consists of a wooden gate <br />across the roadway and would be augmented with additional fencing that would extend <br />fi:om the emergency gate to the townhouse structures on both the east and west sides of <br />the streets, thus pedestrian access as well as vehicular access would be blocked. <br /> <br />It is staff's opinion that excluding pedestrian access exceeds the original intent of the <br />barricade. There have been several police incident reports over the pedestrian use of this <br />segment of Argon Street. <br /> <br />At this point, the Developer has had the gate fabricated and it is ready for installation. <br />Staff has requested that the installation be delayed so that the Committee could consider <br />this matter prior to incurring the additional cost of installation. <br /> <br />Action: <br /> <br />Based upon discussion <br /> <br />Reviewed by: <br /> <br />Director of Public Works <br />Principal City Engineer <br />Street Maintenance Supervisor <br /> <br />PW: 07/16/02 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.