My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 08/19/2002
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2002
>
Agenda - Public Works Committee - 08/19/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 1:55:27 PM
Creation date
5/12/2003 1:57:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
08/19/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.W. CASE <br /> <br />CONSIDER EXPENDITURE FOR 2002 PRIORITY STREET LIGHTS <br /> By: Steven J. Jankowski, City Engineer <br /> <br />Background: <br /> <br />Annually the City has budgeted $25,000 for the installation of street lights associated <br />with the City's priority street lighting system. This system includes street lights on the <br />higher speed arterial and collector roadway at intersections with other public roadways. <br />This program was begun in the early 1990's and the City has been steadily working <br />toward its completion by adding 10 to 15 lights each year. At the present time the system <br />is comprised of lights at 146 locations with an additional 29 locations remaining to be <br />served. <br /> <br />Recently, the Public Works Committee observed that some of the lights at tee <br />intersections are located on the wrong side of the intersection (the opposite side from that <br />of the side street). Staff has surveyed the system and found that there are 14 such <br />locations throughout the system. A listing of these locations is as follows: <br /> <br />CR 83/158th Lane <br />CSAH 5/Green Valley Road <br />CSAH 5/165th Lane <br />CR 56/162nd Lane <br />CR 56/Jasper Street <br />CR 56/143rd Avenue <br />CSAH 5/150th Lane <br />CR 57/144th Avenue <br />CR 57/142nd Lane <br />TH 47/CR 63 <br />TH 47/170th Lane <br />TH 47/167th Lane <br />CR 63/Wolverine <br />CR 63/Unicorn <br /> <br />Having a limited budget coupled with the need for a long term program for the <br />completion of the priority street lighting system, priority lights were installed in the most <br />economical manner available. The use of existing poles and locations nearer to <br />transformers were less costly to install. <br /> <br />Individual lights could be relocated from the "wrong" side of the street but at a cost that <br />would approach the installation of a light at an unlit intersection, approximately $1800 <br />per light. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.