My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 12/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:36:50 PM
Creation date
1/10/2020 9:08:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anoka County <br />MINNESOTA <br />Respectful, Innovative, Fiscally Responsible <br />4.4.2.2 Future Structure Vulnerability <br />In Anoka County, only the hazard flooding has <br />an identified geographic location and is defined <br />by 100 and 500-year floodplain maps. <br />The hazard narratives in the hazard analysis <br />section 4.2, describe the vulnerability of current <br />structures in existing flood hazards in terms of <br />impact, extent and future occurrences of <br />flooding. <br />The table below identifies potential new <br />structures that may be constructed in the flood <br />plain area and the vulnerability of those <br />structures to future flooding events within <br />specific municipalities and Anoka County. <br />Anoka County 2019 <br />Multi -Jurisdictional <br />All Hazards Mitigation Plan <br />Multi -hazard Requirement §201.6(c)(2)(ii)(A): <br />The plan should describe vulnerability in terms <br />of the types and numbers of existing and future <br />buildings, infrastructure, and critical facilities <br />located in the identified hazard area. <br />FMA Requirement §78.5(b): Description of <br />the existing flood hazard and identification of <br />the flood risk, including estimates of the number <br />and type of structures at risk, repetitive loss <br />properties. <br />B. Does the plan describe vulnerability in <br />terms of the types and numbers of future <br />buildings, infrastructure, and critical facilities <br />located in the identified hazard areas? <br />116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.