My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2019
Ramsey
>
Public
>
Agendas
>
Council
>
2019
>
Agenda - Council - 12/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:36:50 PM
Creation date
1/10/2020 9:08:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anoka County <br />MINNESOTA <br />Respectful, Innovative, Fiscally Responsible <br />Anoka County 2019 <br />Multi -Jurisdictional <br />All Hazards Mitigation Plan <br />For example, if the library was closed for 7 days (loss of function) and then resumed operations <br />from an empty trailer rented for $10 per day for the next 90 days, the displacement cost would <br />be $900 (90 days x $10 per day). <br />For residences the cost of displacement would be the cost of alternate facilities and the average <br />time of residential construction in Anoka County. <br />If content value is unknown the following uplift factors can be applied to the structure value: <br />• Residences — 20% <br />• Agriculture — 30% <br />• Government —40% <br />• Commercial —60% <br />Cubic yards calculations are based on the structure's square feet and the estimated damage. <br />Then using appropriate factors to estimate burnable, soil, metal and building demolition debris. <br />Disposal costs per cubic yard and landfill acres costs are provided by local sanitation officials. <br />If square footage is unknown an approximate square footage can be calculated from the <br />structure cost. For example, use the typical governmental and commercial construction cost in <br />the county and divide that into the structure cost. If construction cost is $200 per square foot <br />and the structure value is $1,000,000 the approximate square footage is 5,000 square feet. <br />For Residential square footage use the median cost of housing in the county and divide that by <br />the dollar per square foot building cost across the county. The median value is currently <br />$121,500 and the estimate is $150 per square foot. <br />Response, evacuation, recovery and other costs are calculated using a factor times total <br />structure value. The premise is that structure loss is directly related to the impact and extent of <br />the hazard and therefore can be used as a basis for costs estimates. <br />Wages lost are a direct calculation of displaced days, structure capacity or workforce and the <br />average daily wage for the jurisdiction <br />124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.