Laserfiche WebLink
2020 thru 2029 <br />Capital Improvement Program <br />City of Ramsey, Minnesota <br />Capital Equipm <br />Eqpt Replacem <br />N <br />Capital Equipment <br />3-Existing Obligation (Med) <br />qA O <br />� Fy a bA p -0.+ <br />a <br />Project Name Replace Engine #21 (565) <br />Total Cost $700,000 <br />a 'c <br />Q <br />N U <br />y U <br />• bp F7 <br />L: �O O <br />U � O <br />y 0 c <br />O <br />O. 0 <br />pOp O 09 <br />b <br />a <br />O 'b ct <br />z <br />-0 0 <br />w~ <br />0 E <br />U N Q" <br />Uoz, o <br />U U U <br />• <br />L9 • 0 0 <br />• O 0 <br />0 30, y0l <br />• •U 0 <br />0•i U <br />O0 <br />N '� <br />by <br />o '° '3 <br />•.--� <br />e:D <br />N bA <br />ct <br />U • U <br />O •0' O <br />0 <br />bhp <br />0 U <br />U i i <br />U R <br />U • 0� <br />U � <br />y <br />0 0 w 07 <br />y > c <br />0 t <br />U <br />byct <br />O <br />0 ° w <br />O 0 4a a-) <br />• 0 O <br />oU P c„, " <br />max• � <br />o a, <br />N a"i bhp <br />• E <br />v• <br />bhp 6" <br />N <br />N <br />N <br />71. <br />Furnishings/Equipment <br />CI <br />0 <br />N <br />N <br />N <br />N <br />N <br />O <br />N <br />O <br />N <br />O <br />N <br />O <br />Funding Sources <br />General Fund <br />0 <br />0 <br />