Laserfiche WebLink
2020 ih zf 2029 <br />O <br />pi ▪ ▪ a) <br />44 <br />a) <br />O • a) <br />P-1 rl <br />4—,• <br />U U <br />Site Acquisitions <br />06-ACQ-001 <br />Site Acquisition <br />nfunded/Placeholder <br />Future Consideration <br />Total Cost $3,000,000 <br />N <br />0 O <br />U <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />bq <br />0 <br />0 <br />0 <br />O <br />0 <br />0 O <br />4. <br />E. <br />0 <br />O <br />0 <br />0 <br />-0 <br />0 <br />0 <br />.0 <br />0 <br />U <br />U <br />.0 <br />cd <br />0 <br />0 <br />-c7 <br />.fl <br />Ci, <br />H <br />The park should have a minimum of 60 acres of usable land. <br />Justification <br />ng and future reside <br />0 <br />ill be required t <br />Given the projected build -out of Ramsey, it <br />0 <br />0 <br />N <br />oo <br />O <br />N <br />O <br />N <br />M <br />N <br />O <br />0 <br />N <br />N <br />N <br />O <br />O <br />Expenditures <br />0 <br />0 <br />0 <br />0 <br />0 <br />Land Acquisition <br />0 <br />O <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />N <br />N <br />00 <br />r <br />O <br />O <br />N <br />N <br />O <br />71. <br />N <br />O <br />M <br />O <br />N <br />N <br />N <br />N <br />O <br />Funding Sources <br />O <br />0 <br />0 <br />0 <br />O <br />O <br />0 <br />0 <br />0 <br />O <br />O <br />0 <br />0 <br />O <br />0 <br />0 <br />0 <br />0 <br />0 <br />O <br />F <br />1 <br />