My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/21/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 01/21/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:26:30 AM
Creation date
1/21/2020 10:32:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 8. Average calculated coefficients of permeability from laboratory permeability testing according to ASTM <br />PS 129-01 <br />Permeability, K Permeability, K <br />20 <br />Location <br />(10-5 cm/sec) (10-5 cm/sec) <br />Blaine - 93rd Ave East End 0.8 0.6 <br />Blaine - 93rd Ave West End 1 0.8 <br />Brooklyn Park 73rd Ave 10.7 7.8 <br />Brooklyn Park - Louisiana Ave 0 0 <br />Brooklyn Park - Winnetka Ave 0 0 <br />Burnsville - 134th St 3.1 2.3 <br />Burnsville - Heritage Cir Area 0.4 0.3 <br />Burnsville - Knob Hill Area 0.4 0.3 <br />Cottage Grove - Hyde Ave S 0.2 0.2 <br />Cottage Grove - Ingberg Trl S 3.5 2.5 <br />Cottage Grove - Jensen Ave 6.9 5 <br />Inver Grove Heights - Brooks Blvd 0 0 <br />Osseo 8th Ave SE 4 2.9 <br />Sibley County CSAH 9 North Portion 0 0 <br />Sibley County CSAH 9 South Portion 0 0 <br />Woodbury - Bridgewater 0.3 0.2 <br />Woodbury - Newbury Alcove Cul de sac (Unsealed) 0 0 <br />Woodbury - Newbury Alcove Straight Portion 0 0 <br />3.2.5 Overview of tensile strength ratio testing <br />As the results of TSR tests are sometimes used to infer long-term behavior of asphalt in terms of <br />stripping, the results of these tests are relevant to this study. For this project material obtained from the <br />roadway cores was heated and re-compacted at 7% and 11% air voids and TSR tests were performed on <br />27 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.