My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/21/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 01/21/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:26:30 AM
Creation date
1/21/2020 10:32:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to a four-lane divided highway with turn lanes and signal system modifications at Highway 10, <br />railroad crossing upgrades, and signal systems installed at Sunwood Drive and Bunker Lake <br />Boulevard. This work has been completed. Phase 3 is one of the larger and more costly <br />improvements required by the JPA. This work includes the expansion of Bunker Lake <br />Boulevard between Armstrong Boulevard and Ramsey Boulevard to a four-lane divided highway <br />with turn lanes and construction of signal systems at Center Street and Sunwood Drive. This <br />project was estimated to cost $3,170,109 in 2005. This work has not been completed. It was <br />originally intended to be completed in 2007 based on anticipated development, but was delayed <br />Sunfish Lake Boulevard from Highway 10 to 1,000 feet north of Bunker Lake Boulevard <br />including expansion to a four-lane divided highway with turn lanes and signal system <br />modifications at Highway 10, railway crossing upgrades, and a signal system installed at Bunker <br />Lake Boulevard. This work has been completed. <br /> <br />City Engineer Westby stated that Anoka County Highway Department staff recently informed <br />City staff that they want to expand Bunker Lake Boulevard to a four lane divided highway all the <br />way to Armstrong Boulevard in anticipation of the need for a reliever route due to the work <br />proposed to Highway 10 through the cities of Coon Rapids (adding a third lane to Highway 10 in <br />each direction) and Anoka (the Anoka Solution improvements). Anoka County is starting to <br />explore their right-of-way needs related to expanding Bunker Lake Boulevard between Sunfish <br />Lake Boulevard and Ramsey Boulevard, and asked that the City of Ramey begin designing the <br />required improvements for Bunker Lake Boulevard between Armstrong Boulevard and Ramsey <br />Boulevard per the JPA. He stated that in speaking with Economic Development Manager <br />Sullivan, because of the use of TIF it would be recommended to complete the project in 2021. <br />City staff is in the process of developing a Request for Proposals (RFP) to solicit engineering <br />services for the preparation of plans and specifications for improvements to Bunker Lake <br />Boulevard between Armstrong Boulevard and Ramsey Boulevard. Staff is prepared to present a <br />draft RFP to the City Council on December 10, 2019, and to request authorization to solicit <br />proposals directly to engineering companies as selected by Anoka County. Staff therefore <br />requests that the Public Works Committee recommend City Council approval of this request. <br /> <br />Chairperson Kuzma asked if the speed would change. <br /> <br />City Engineer Westby confirmed that would be part of the traffic study. <br /> <br />Councilmember Menth asked and received confirmation that the estimated cost of $5,000,000 <br />would only apply to the section from Armstrong to Ramsey Boulevard. <br /> <br />Councilmember Riley asked why the City would be responsible for paying and improving a <br />County road. He asked if there is something historical that relates to the creation of that JPA. <br /> <br />City Engineer Westby stated that he could review information from the past to determine where <br />that decision came from. <br /> <br />Councilmember Riley stated that he would want to better understand the reasoning for the JPA <br />and why the financing and construction of the County road would fall to the City. <br />Public Works Committee / November 19, 2019 <br />Page 4 of 7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.