My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 01/28/2020
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2020
>
Agenda - Council Work Session - 01/28/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:21:34 AM
Creation date
1/30/2020 10:59:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
01/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Minneapolis <br />East Side Storage & Maintenance Facility & Master Planning Study <br />Minneapolis, Minnesota <br />2016 - Present <br />Hagen Christensen & Mcllwain Architects and its team designed Minneapolis' New East Side Storage & <br />Maintenance Facility providing a multi -purpose building and site to be utilized as a municipal operations campus <br />that will facilitate a variety of large-scale storage and maintenance needs. This was a brownfield site directly <br />adjacent to a residential neighborhood. HCM's services included a Master Planning study, programming, facility <br />modeling studies, all design phases, interior design, structural and electrical/mechanical design coordination, <br />collaborative energy modeling process, full site design as well as complete documentation through the current <br />construction process. <br />The entire Project Team set goals for the site and building to be LEED Gold Certified, providing a facility that <br />functions with high efficiency, operates for long-term use, and fulfills the City's growing needs for the <br />future/community with features such as landscape buffers with bicycle and walking paths. HCM's design provided <br />a realistic project budget and efficient timeline for construction and occupying the building. <br />Project Team: Dan Lind, HCM <br />Principal, Project Architect <br />Matt Lysne, HCM <br />Principal, Project Architect <br />Civil / Landscape: Loucks <br />Structural: MBJ <br />Mechanical: EP <br />Electrical: EP <br />Interior Design: Isola Design <br />- <br />Programming — Master Planning <br />/01MIQ Fr JI 40d <br />TOM, _IA NMI <br />tla_4.1.11,1WO <br />NRWb MOD <br />, ,$1. 1.M <br />n w.wra xM <br />MMt <br />N▪ AYORM wAOo <br />Talk 141 <br />_w4't- Puc <br />II: MO wwsnn. - <br />IO(Alm nwn •i1.4.b0 intll. nJ00 <br />.Ovu,Or1 w0 0101.1 IC* <br />Vrag.,p. y.ipp ✓l0,er* <br />Project Contact: Chris Backes <br />City of Minneapolis <br />350 South 5th Street, Rm # 223 <br />Minneapolis, MN 55415 <br />612-673-3774 <br />Project Budget: $40,000,000 <br />Master Planning — Site Options <br />Programming — Master Planning <br />23 <br />Programming — Schematic Design <br />
The URL can be used to link to this page
Your browser does not support the video tag.