My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 01/28/2020
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2020
>
Agenda - Council Work Session - 01/28/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:21:34 AM
Creation date
1/30/2020 10:59:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
01/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Woodbury <br />Public Works & Parks Maintenance Renovation & Expansion <br />Woodbury, Minnesota <br />2016 - 2019 <br />Hagen Christensen & Mcllwain Architects and its team designed a full renovation and expansion to the existing <br />128,000 square foot Maintenance Facility on the two parts of the existing Tower Drive campus in the heart of <br />Woodbury's residential neighborhood. Through the Master Planning Study, it was proven that the long-term needs <br />of the facility could be met on the existing site through an extensive reorganization of the campus. The site posed <br />significant grading challenges as well as construction phasing issues due to operations being maintained on the <br />site throughout the life of the project. Coordination with the Construction Manager was key in delivering this project. <br />Renovation areas, such as the 13,000 square foot existing office space & the 2,800 square foot breaklmuster <br />room, provided for a revitalized collaborative work environment utilized by all staff. Creative reuse of building <br />areas, such as the conversion of existing fleet services space to staff support areas via the internal expansion of <br />the second floor, provided more square footage without increased exterior additions. Ultimately, the goal of <br />bringing a divided staff back together was realized. Furthermore, the addition of new warm vehicle storage square <br />footage, a new stand-alone cold storage building, and a separate 23,000 square foot fleet services building created <br />a more safe, efficient and flexible operational flow. <br />Project Team: Jerry Hagen, HCM <br />Principal, Project Manager <br />Dan Lawrence, HCM <br />Project Architect <br />Civil / Landscape: BMI <br />Structural: ERA <br />Mechanical: EP <br />Electrical: EP <br />Interior Design: Isola Design <br />Programming — Master Planning Study — Existing Conditions <br />Design Development— Rendering <br />Project Contact: Teresa Keller <br />City of Woodbury <br />8301 Valley Creek Road <br />Woodbury, MN 55125 <br />651-714-3593 <br />Project Budget: $20,000,000 <br />Master Planning Study— Design Option <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.