My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 01/28/2020
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2020
>
Agenda - Council Work Session - 01/28/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:21:34 AM
Creation date
1/30/2020 10:59:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
01/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington County <br />Public Works North Shop & Master Planning Study <br />Stillwater, Minnesota <br />2012 - 2016 <br />Hagen Christensen & Mcllwain Architects initially provided design services for an assessment, programming and <br />master planning study for Washington County's North Shop Public Works Facilities. The goal was to understand the <br />long-term needs of the Public Works Departments and develop a phased implementation plan so as to confirm that <br />the existing facility and site could be expanded and improved to support all future operations. This was paired with <br />a cost estimating process to determine a project budget that was accurate. <br />HCM Architects and our Design Team was then selected to provide full design services through construction for the <br />North Shop facility renovation and expansion project. The project utilized as much of the existing structure as <br />possible for cost and sustainability reasons. Additions included a new Fleet Services building with a wash bay, an <br />expansion to the warm vehicle storage area and a new office and entry wing. The existing sign and signal shop area <br />was renovated. A separate, subsequent phase of the project added a new fuel island to the site. <br />Project Team: Tim MclLwain, HCM <br />Principal, Project Manager <br />Dan Lawrence, HCM <br />Project Architect <br />Civil / Landscape: BMI <br />Structural: ERA <br />Mechanical: EP <br />Electrical: EP <br />Interior Design: Isola Design <br />Project Contact: Don Theisen <br />Washington County Public Works <br />11660 Myeron Road North <br />Stillwater, MN 55082 <br />651-430-4304 <br />Project Budget: $17,500,000 <br />Phased Implementation Master Planning Study— Design Option <br />Design Development— Rendering <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.