My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 01/28/2020
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2020
>
Agenda - Council Work Session - 01/28/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:21:34 AM
Creation date
1/30/2020 10:59:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
01/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anoka County <br />Highway Department Facility & Master Planning Study <br />Andover, Minnesota <br />2010 — 2013 & 2019 <br />Hagen Christensen & Mcllwain Architects initially worked with the Anoka County Highway Department to <br />develop the "Ultimate Master Plan" for their facility. The Project involved an extensive Audit & Assessment of <br />the existing facility, Department Programming for 2010, 2015 & 2035, Schematic Design, Project Implementation <br />Strategies and Project Cost Estimates. Each phase can stand alone without the other phases needing to follow <br />immediately after, allowing the County to implement each as funding allows. <br />HCM Architects and our design team was then selected to complete the design and construction documents <br />for Anoka County Highway Department Phase 1 of the "Ultimate Master Plan" for their facility. Overall Phase 1 <br />addresses the most significant safety and work space issues of the facility while concentrating on the deferred <br />maintenance items identified as part of the audit. HCM created a construction phasing plan that allowed for <br />uninterrupted Highway Department Operations and construction work simultaneously. The goal was to not <br />substantially change the original use of the spaces being remodeled by recapturing under-utilized and inefficient <br />existing space. <br />In 2019, HCM Architects was selected by the Anoka County Highway Department to develop Phase 2 of the <br />"Ultimate Master Plan" design concepts and programming for implementation in the coming year. This study is <br />currently ongoing. <br />Project Team: Jerry Hagen, HCM <br />Principal, Project Manager <br />Dan Lind, HCM <br />Project Architect <br />Civil / Landscape: Loucks <br />Structural: ERA <br />Mechanical: EDI <br />Electrical: EDI <br />Interior Design: HCM <br />Phase 1 Master Plan <br />Project Contact: Doug Fisher (Retired, 2019) <br />x <br />x <br />x <br />x <br />Project Budget: $12,000,000 <br />Phase 1 — Schematic Design Plan <br />Design Development - Rendering <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.