<br />4.3 Bituminous Overlay Review <br />Staff reviewed this project from the traditional overlay procedure. The rural sections in the <br />Klemish, and Klemish & Flores neighborhood, has previously received an overlay. Staff proposed <br />to complete a 6 to 7-foot edge mill of the pavement, down to 2-inches along the outside edge of <br />the pavement, followed by a 2-inch bituminous overlay. This allows the edge of the pavement to <br />match existing driveways, and builds up the crown of the road. The urban sections in the Sunfish <br />Square, and Windemere Woods neighborhoods proposed to receive a 2-inch mill, followed by a <br />2-inch bituminous overlay. While reviewing the proposed streets, Staff discovered the pavement <br />has deteriorated in several areas, beyond the point where a bituminous overlay is feasible. <br /> <br />Klemish outside of Sodium Street. To complete the bituminous overlay as described above, the <br />project costs are estimated to be $538,661.97. <br /> <br />Staff felt this was not a cost-effective solution, given the poor condition of the streets, which in <br />general are distressed beyond a typical bituminous overlay treatment. <br /> <br />4.4 Full-Depth Reclamation <br />In the recent past, including the 2017 and 2018 reconstruction programs, streets with similar <br />conditions received full-depth reclamation treatments. This included grinding up the existing <br />bituminous pavement and underlying aggregate base, after which 3.5-inches of the reclaimed <br />material is removed with the remaining used as new aggregate base. Then 3.5-inches of new <br />bituminous pavement is placed on top. In general, the streets are still at the stage where with <br />maintenance, Staff feels they can be useful for 5 to 10 <br />can be spent on streets which are better candidates for overlays, or are ready for reconstruction. <br /> <br />for the proposed project areas, with the exception of all of <br />Klemish outside of Sodium Street. To complete the full-depth reclamation as described above, the <br />project costs are estimated to be $751,863.92. <br /> <br />Staff felt this was not a cost-effective solution, and given the limited founding available there are <br />other City streets which are at the proper condition for overlay treatments. <br /> <br />5. CONCLUSIONS AND RECOMMENDATIONS <br />This feasibility report explores proposed bituminous pavement overlay improvements to <br />approximately 19,612 square yards of public streets in 2020. The street segments were proposed <br />to receive 2-inch bituminous overlays, in conjunction with milling and full-depth patching as <br />needed. Full-depth reclamation options were also looked at for the proposed street segments as a <br />possible alternative to the poor conditions found during Staff review of the streets. <br /> <br />Feasibility Report <br />Pavement Overlay Improvements <br />City of Ramsey Project No. 20-02 <br />6 <br /> <br />