My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/12/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 04/12/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:47:09 PM
Creation date
4/8/2005 3:21:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/12/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I IP, A I';xecutive Director Frolik noted that a traffic generation analysis will be done as part of the <br />l';nvironmental Assessment and suggested this consideration be delayed until that information is <br />awtilablc. <br /> <br />Commilme~nber Jeffi'ey stated that would address his concern. <br /> <br />Councilmembcr Strommen stated there is another option, noting the City is in the process of <br />draliing a Wetland Buffer Ordinance and it appears there are some areas along the wetland where <br />a wetland buffer could be captured. <br /> <br />Mt'. l'eterson asked Derrick Passe to come forward to address that issue. <br /> <br />Mr. l)crrick Passe, Passe Engineering, stated he has reviewed the draft Wetland Buffer <br />Ordinance and did look at thc potential classifications of the wetlands. He stated that regulation <br />is mci on all but one or two lots and they will endeavor to meet it on those lots as well. <br /> <br />Cotmcihnelnber Cook stated they are also working on a greenway map and it will probably be <br />adopted by the time thc final plat is considered. He asked the applicant to also address that <br />consideration. <br /> <br />Mr. i'eterson stated they are aware of that consideration and talked with City staff to get more <br />ideas, tlc stated they can find a way to allow animals to traverse the corridor and wild areas. <br /> <br />Mr. Bud Augst noted that sewer and water is being extended to this area so it is not an issue of <br />the fire truck having to go to the hydrant for water. He noted there are three entrances into that <br />area and asked it" it is more safe to have a fourth entrance or having all that traffic come through <br />this area. <br /> <br />Mayor Gamcc stated that issue will be addressed when the traffic study is done. A public hearing <br />will also be held at the preliminary plat stage. He explained the developer will now create a <br />preliminary plat and meet the requirements. When the preliminary plat is considered, there may <br />be changes made including alignment. <br /> <br />Councihncmber l';lvig stated he does not see a logical reason to connect Traprock but is willing <br />to wait until thc study is completed. He stated it is his understanding that trails will be required <br />fi'om this area to Alpine to connect with Central Park. He asked if a connection from Elmcrest <br />Park will also be required. <br /> <br />Assistant Public Works Director Olson explained that as part of the sewer extension, access <br />lhrough the wetland would be needed. He stated it has long been a vision of the City to have a <br />connection fi'om Central Park to Elmcrest Park. <br /> <br />Councihncmber Elvig stated this property is in the center, abuts the most significant band of <br />greenways, and a very important point of connection. <br /> <br />City Council / March 22, 2005 <br /> Page 22 of 38 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.