My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/12/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 04/12/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:47:09 PM
Creation date
4/8/2005 3:21:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/12/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case #12: Consider Light Pole and Banner Arm Specifications <br /> <br />Assistant l'ublic Works Director Olson noted that the Streetscape Plan does not include banners <br />tm the light poles within the Ramsey Town Center and staff believes the City needs to plan for <br />thc ['uturc enhancement of thc streetscape plan to include the ability to install banner arms and <br />banners on Sunwood Drive from Armstrong Boulevard to Ramsey Boulevard. He advised that <br />intbrmation on banner arms was presented at the March Public Works Committee meeting and <br />they recommended providing inserts in the poles at 8.5 feet and 12.5 feet above the ground. <br /> <br />Assistant Public Works Director Olson explained that normally this case would be included in <br />the l)ublic Works report that is presented at the first Council meeting of the month. However, <br />there is an 8-12 week delivery time after the order is placed. This action is being brought <br />fi)rward to expedite the process so that the order can be placed. Connexus will begin installing <br />thc poles after they arrive. <br /> <br />Motion by Councilmember Cook, seconded by Councilmember Elvig, that two inserts be <br />included in each of the poles that are ordered for Sunwood Drive located at 8.5 feet and 12.5 feet <br />fi'om thc elevation of the ground. <br /> <br />Motion carried. Voting Yes: Mayor Gamec, Councilmembers Cook, Elvig, Jeffrey, Pearson, <br />and Slrommen. Voting No: None. Absent: Councilmember Olson. <br /> <br />Case #13: Consider Contract Revision to LSA Design <br /> <br />Assistant Public Works Director Olson reviewed that the scope of services for LSA Design <br />approved last year assumed that the first phase of the parking ramp will only include 460 cars. <br />At'tot recently changing the first phase of the parking ramp to include the fourth level and up to <br />600 stalls, there is also a need to increase the scope of services for design services. He advised <br />limt the Public Works Committee considered this case at their March meeting and recommended <br />amend lng the contract for LSA to reflect these changes. Full Council action would normally take <br />place alt the first meeting in April when the Public Works Committee report is received; however, <br />ibis is time sensitive and is being brought forward at this meeting. <br /> <br />Councilmember Elvig stated he had the opportunity to work with LSA Design on other projects <br />and lbtmd they do a good job. <br /> <br />Motion by Councihnember Elvig, seconded by Councilmember Cook, to approve the contract <br />amendment for I~SA Design to include the items that are in the proposal with funding from a <br />combi nation of the parking ramp project and the escrow from the Ramsey Town Center. <br /> <br />Motion carried. Voting Yes: Mayor Gamec, Councilmembers Elvig, Cook, Jeffrey, Pearson, <br />and Strommcn. Voting No: None. Absent: Councilmember Olson. <br /> <br />City Council / March 22, 2005 <br /> Page 35 of 38 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.