My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/12/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 04/12/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:47:09 PM
Creation date
4/8/2005 3:21:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/12/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
need ro be adjusted to balance of' amount of' earthwork associated this the new section and <br />gad. es. The southern terminus of the roadway shall be provided with a 70 foot diameter <br />cttl de sac. This is approximately I0 feet wider than the existing dirt cut de sac. It will be <br />necessary to install a storm culvert alond TH 47 to maintain the drainge fi.om the <br />highway. Apermit from MnDOT Will be required for this aspect of the project as well as <br />ail work within their right of way. <br /> <br />Existing driveways shall be neatly cut and repaved with ilke mater/al. Disturbed turfed <br />are~ on the east side of the roadway shall be restored with four inches'of topsoil and be <br />seeded with a highway turf mixture. Disturbed areas on the west side of the roadway shall <br />be restored with 4 inches of'topsoil .and sod. <br /> <br />At the time of this writing i.t is anticipated that a development proposing the extension of <br />sewer and water services to property on the east side of TH 47 Mil cause construction <br />impacts to this project area. Ln the event such a project materializes 'the above described <br />improvements may be altered to include sanitary sewer, .watermain storm sewer and <br />concrete curb and gutter. . <br /> <br />E'STI~LATED COSTS <br /> <br />An estimate of the costs described in'the section above [s. detailed [ri Appendix C. In <br />addition to the estimated construction costs an additional 25% has been included to cover <br />the overhead cost associated with this project. These costs include; 'en~neering design <br />8%; project administration 5%; bonding and legal 2%; inspection and testing 5%; and 5% <br />for contingencies. <br /> <br />Should this project be modified in scope as a result 0fsewer and water construction, the <br />above costs will need to be appropriately modified to reflect these additional <br />improvements. However, it is proposed that the cost to the benefited properties shall be <br />held to those outlined in this report. <br /> <br />FINANCING <br /> <br />The costs have been segregated into those attributable to the construction the eight foot <br />bituminous trail and the remaining Work of Fading and paving the roadway. The total <br />cost of the work is estimated to be $46,011. The estimated cost of the trail is $7,863 <br />which is to be financed through the city's trail fund. The remaining costs of $38,149 are <br />to be £manced equally between the city through its general funds and through special <br />assessments to the benefited property owner. The assessable cost of $19,075 is proposed <br />to be divided equally among the three fronting property owners.. This would result in an <br />assessment of 56,358 per property. I£ a property owner would elect to have this <br />assessment collected over a ten year period at an estimated interest rate of 6.5%, annual <br />payments would range from $1,049 to $677 over this ten year period. <br /> <br />,Ks stated in the costs section above, if sewer and water impacts resuli in addiiionaI <br />improvements and associated costs, it is proposed that these additional costs shall be <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.