My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/12/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 04/12/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:47:09 PM
Creation date
4/8/2005 3:21:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/12/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # <br /> <br /> CONSIDER LIGHT POLE AND BANNER ARM SPECIFICATIONS <br />By: Brian E. Olson, Assistant Director of Public Works/Principal City Engineer <br /> <br />Background: <br /> <br />The Streetscape plan that was submitted does not 'include banners on the light Poles <br />within the Ramsey Town Center but Staff feels that we need to plan for the future <br />enhancement of the streetscape plan to include the .ability to install banner arms and <br />banners on Sunwood Drive from Armstrong Boulevard to Ramsey Boulevard. <br /> <br />The Master Developer has agreed and, the light poles have been designed to <br />accommodate this request. Con.nexus has received a request and the money' for the initial <br />order of 100 light poles and fixtures from the Master Developer and want City approval <br />of the design of these banners before placing the order. <br /> <br />There is a 8-12 week delivery time for these fixtures and poles and Connexus would like <br />a decision soon so they can begin installing them as soon as possible this summer. <br /> <br />The poles are desig-ned to accommodate wind loads for one 2 foot by 4 foot banner as <br />well as any street sioo-ns that may be necessary. Included in this case is a detail showing <br />the options that we have available for future banner installation under the current <br />proposal. It is difficult to know exactly which configuration to choose until there is <br />further study of the content of the banners themselves, however, the intent of this case is <br />to provide for flexibility for the future design of the banners. <br /> <br />Connexus has concerns regarding the height of the banner arms from the sidewalk <br />elevation because of vandalism. They do not think that the lower banner arms should be <br />any lower than 8.5 feet. <br /> <br />Staff feels that there will be considerable discussion on the design of the banners and is <br />recommending that there be two inserts (Staff will have a display of the insert available <br />for the meeting) on the light poles on Sunwood Drive as well as one banner arm included <br />as hardware for each light pole. Any additional hardware that is necessary for the banner <br />installation will be a responsibility of the City when banners are ordered in the future. <br /> <br />Staf'f also recormnends that the inserts be located at 8.5 feet and i2.5 feet as shown on the <br />attached drawing to provide maximum flexibility for the future banner design. <br /> <br />45 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.