My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/11/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 02/11/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:21:46 AM
Creation date
2/26/2020 11:00:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/11/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
808
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 1. Introduction <br />Objectives of Research and Methodology <br />This report represents task 6 — Draft Final Report of Local Road Research Board (LRRB) project <br />number 904, Minnesota State Planning and Research project number MPR 10-(042) study <br />entitled, "Stripping of Hot -Mix Asphalt Pavements under Chip Seals". <br />The objectives of this research project were to determine why some streets suffer from stripping <br />of the hot -mix asphalt (HMA) pavement after placement of asphalt chip seal. Using this data we <br />will recommend how to determine if streets will suffer from stripping prior to chip sealing. Also <br />recommendations will be made on how to improve performance of streets starting with paving of <br />the asphalt pavement. <br />The research efforts where made up of the following tasks: <br />• Task 1 Survey Cities and Counties to determine the extent of the stripping under chip <br />seals. <br />• Task 2 Develop and modify existing test methods to determine is the HMA in place on <br />streets is prone to stripping. <br />• Task 3 Core and test the cores from City streets. <br />• Task 4 Review past and present construction methods of cities for asphalt paving streets. <br />• Task 5 Analyzed the test results from cores. <br />• Task 6 Draft final report <br />• Task 7 Final Report <br />• Task 8 Implementation Plan <br />Background: Stripping Under Chip Seal Distress <br />For more than twenty years, Cities have experienced pavement deterioration of the upper 0.5 to <br />1.0 inch of HMA pavements under chip seals. The distress causing this is stripping of the <br />asphalt layer directly beneath the chip seal (Figures 1 and 2). This distress starts as a small <br />blister and becomes enlarged to the size of a small pothole; at which time the chip seal <br />delaminates off of the asphalt pavement. <br />With the high cost of asphalt, the use of pavement preservation treatments has grown rapidly as <br />agencies preserve their roadway system. Most of the incidents of this distress have been <br />located on urban curb and gutter streets. If the distress is localized small patch will restore the <br />street. However, as the area of deterioration expands a thin mill and overlay may be required to <br />restore the street. This distress may lead to an expensive maintenance problem. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.