My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/11/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 02/11/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:21:46 AM
Creation date
2/26/2020 11:00:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/11/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
808
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.1 Blaine <br />Two locations in Blaine, MN, were examined for the project work. Separate ends (west and east) of a <br />stretch of 93rd Avenue were surveyed and cored on December 1, 2014. <br />2.1.2 Brooklyn Park <br />Three locations in Brooklyn Park, MN, were examined for the project work. Sections of 73rd Avenue, <br />Louisiana Avenue, and Winnetka Avenue were surveyed and cored on December 2, 2014, and December <br />3, 2014. <br />2.1.3 Burnsville <br />Three locations in Burnsville, MN, were examined for the project work. Sections of 134th Street, Heritage <br />Circle, and Knob Hill were surveyed and cored on November 24, 2014, and November 25, 2014. <br />2.1.4 Cottage Grove <br />Four locations in Cottage Grove, MN, were examined for the project work. Sections of Hyde Avenue, <br />Ingberg Trail, Jensen Avenue, and Jergen Avenue were surveyed and cored on November 18, 2014, and <br />November 19, 2014. The cores from Jergen Avenue could not be extracted intact and therefore were <br />not included in the study. <br />2.1.5 Inver Grove Heights <br />One location in Inver Grove Heights, MN, was examined for the project work. A section of Brooks <br />Boulevard was surveyed and cored on November 21, 2014. <br />2.1.6 Osseo <br />One location in Osseo, MN, was examined for the project work. A section of 8th Avenue was surveyed <br />and cored on December 5, 2014. <br />2.1.7 Sibley County <br />Two locations in Sibley County, MN, were examined for the project work. Separate ends (north and <br />south) of a stretch of County State Aid Highway (CSAH) 9 were surveyed and cored on December 4, <br />2014. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.