Laserfiche WebLink
20-02 2020 Street Overlay Improvements <br />Engineer's Estimate - Assuming Full Depth Reclamation (FDR) <br />All Areas <br />ITEM MNDOT <br />No. No. UNIT <br />1 2021.501 MOBILIZATION (5%) LS <br />2 2215.501 BITUMINOUS PAVEMENT RECLAMATION (FULL DEPTH) SY 25,130 $ 1.25 $ 31,412.50 <br />3 2331.607 HAUL AND DISPOSE BIT PAVEMENT RECLAMATION (LV) CY 3,050 $ 15.00 $ 45,750.00 <br />4 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GAL 1,760 $ 3.00 $ 5,280.00 <br />5 2360.502 TYPE SP 12.5 NON -WEARING COURSE MIXTURE (SPNWB330C) (2.0") TON 2,770 $ 85.00 $ 235,450.00 <br />6 2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE (SPWEA340C) (1.5") TON 2,080 $ 90.00 $ 187,200.00 <br />7 2506.602 RESET CATCH BASIN / MANHOLE CASTING EA 14 $ 1,000.00 $ 14,000.00 <br />8 2531.501 REMOVE & REPLACE CONCRETE CURB & GUTTER DESIGN SURMOUNTABLE LF 840 $ 50.00 $ 42,000.00 <br />9 2531.604 REMOVE & REPLACE 7" CONCRETE VALLEY GUTTER SY 131 $ 80.00 $ 10,480.00 <br />10 2563.601 TRAFFIC CONTROL LS 1 $ 3,000.00 $ 3,000.00 <br />ESTIMATED <br />QUANTITY <br />1 <br />UNIT COST <br />$ 25,000.00 <br />COST <br />EXTENSION <br />$ 25,000.00 <br />Street Construciton Cost $ 585,572.50 <br />Storm Sewer Construction Cost $ 14,000.00 <br />2020 Overlay Program Construction Cost $ 599,572.50 <br />10% Contingency Cost $ 59,957.25 <br />2020 Overlay Program Project Cost (14% Indirect Cost) $ 751,863.92 <br />Total Project Assessments (25% of Assessable Cost) $ 187,964.00 <br />Miles 0.38 Klemish / Klemish & Flores Individual Assessment (20 Properties) $ 1,849.20 <br />Miles 0.38 Sunfish Square Individual Assessment (33 Properties) <br />Miles 0.15 Sunfish Square 2nd Individual Assessment (34 Properties) <br />Miles 0.31 Windemere Woods Individual Assessment (28 Properties) $ 1,441.10 <br />Miles 0.29 Windemere Woods 2nd Individual Assessment (25 Properties) $ 1,334.00 <br />$ 1,543.00 <br />$ 775.30 <br />Total <br />Miles 1.51 <br />Stormwater Utility Fund $ 13,167.00 <br />Road Reconstruction / Overlay Fund $ 550,732.92 <br />DESCRIPTION <br />