Public Works Committee 6. 1. <br />Meeting Date: 01/21/2020 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Receive Update on Bunker Lake Boulevard Reconstruction - Armstrong Boulevard to Ramsey Boulevard <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to receive an update on the Bunker Lake Boulevard Reconstruction project between <br />Armstrong Boulevard and Ramsey Boulevard, including attempts to amend the Ramsey Town Center Joint Powers <br />Agreement. <br />Background: <br />In April of 2005, a Joint Powers Agreement (JPA) was executed between the City of Ramsey and Anoka County <br />defining required public works improvements related to the Ramsey Town Center development, now referred to as <br />The COR. Two amendments have been executed since, one in February of 2009, and the other in February of 2012. <br />A copy of the executed JPA, including the two amendments, is attached. <br />The required public works improvements, which total slightly more than $13,000,000 in 2005 dollars, are generally <br />intended to be constructed in four separate phases per the JPA. Individual project cost summaries are included in <br />Schedules A through C. The JPA outlines the requirements of each party as related to the design and construction of <br />the improvements, allowable use and access to County -owned properties and highways, and other terms and <br />conditions. <br />Phase 1 identifies required improvements to Ramsey Boulevard from Highway 10 to 1,000 feet north of Bunker <br />Lake Boulevard including expansion to a four lane divided highway with turn lanes and signal system modifications <br />at Highway 10, railway crossing upgrades, and signal systems installed at Sunwood Drive and Bunker Lake <br />Boulevard. This work has been completed. <br />Phase 2 identifies required improvements to Armstrong Boulevard from Highway 10 to 1,000 feet north of Bunker <br />Lake Boulevard including expansion to a four lane divided highway with turn lanes and signal system modifications <br />at Highway 10, railway crossing upgrades, and signal systems installed at Sunwood Drive and Bunker Lake <br />Boulevard. This work has been completed. <br />Phase 3 is one of the larger and more costly improvements required by the JPA. This work includes the expansion of <br />Bunker Lake Boulevard between Armstrong Boulevard and Ramsey Boulevard to a four lane divided highway with <br />turn lanes and construction of signal systems at Center Street and Sunwood Drive. This project was estimated to <br />cost $3,170,109 in 2005. This work has not been completed and was originally intended to be completed in <br />2007 based on anticipated development, but was delayed when development slowed in the late 2000's. <br />Phase 4 identifies required improvements to Sunfish Lake Boulevard from Highway 10 to 1,000 feet north of <br />Bunker Lake Boulevard including expansion to a four lane divided highway with turn lanes and signal system <br />modifications at Highway 10, railway crossing upgrades, and a signal system installed at Bunker Lake Boulevard. <br />This work has been completed. <br />In the fall of 2019, Anoka County Highway Department staff informed City staff they want to expand Bunker Lake <br />Boulevard to a four lane divided highway between Sunfish Lake Boulevard and Armstrong Boulevard in <br />anticipation of the need for a reliever route due to the work proposed to Highway 10 through the cities of Coon <br />