Laserfiche WebLink
Public Works Committee 6. 2. <br />Meeting Date: 01/21/2020 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Staff Updates on Improvement Projects and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed improvement projects <br />within the City, and on other items of interest to the Committee. <br />City Improvement Projects <br />. The COR Regional Infiltration Basin (#18-09) <br />• Grading and storm sewer work complete <br />• Lift station not operable; control panel installed January 2020 <br />• 8K CY sand stockpile proposed to be moved in spring 2020 <br />• 20K CY topsoil stockpile removed (River Walk Village debris backfill) <br />• Processing Change Order #1 addressing excess topsoil removal/backfill <br />• WMO Permit extended to June 30, 2020 <br />• Ford Brook Estates Street Reconstructions (#19-01) <br />• Punch list work and final payment in 2020 <br />• Wood Pond Hills and Chestnut Ridge Street Reconstructions (#19-03) <br />• Punch list work and final payment in 2020 <br />• RTC 9th Addition Pond Lining Improvements (#19-06) <br />• Construction complete <br />• Punch list work and final payment in 2020 <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />• Engineering Staff collecting topographic survey data this winter/spring <br />• Construction proposed for 2020 <br />• Germanium Street Drainage Improvements (#19-09) <br />• Terminated by property owner request <br />• Hedgehog Street Drainage Improvements (#19-10) <br />• First bids rejected due to high costs <br />• Second bids will be advertised this winter <br />• Construction in 2020 <br />• Variolite Street Reconstruction (#20-01) <br />• Final design / preparation of plans and specifications in progress <br />• Detailed update provided during February PWC meeting <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />• Anoka County and City of Ramsey share is $150,000 each (per $1.5M est.) <br />• Anoka County beginning project design in 2020 <br />• Construction is proposed to begin in 2022 pending City and County approvals, but Anoka County is <br />considering moving construction up a year <br />• CSAH 116 & TH 47 Intersection Improvements <br />• Constructing additional turn lanes to improve congestion and safety in 2021 <br />