My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/11/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 02/11/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:21:46 AM
Creation date
2/26/2020 11:00:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/11/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
808
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Ramsey Gateway Project <br />will provide grade separations of US Highway 10/169 and the BNSF Railway to address majo <br />and congestion issues that are greatly impacting the movement of goods and people betwe <br />Minneapolis/Saint Paul metro area and greater northern Minnesota. <br />BLATZ AUTOMOTIVE&EXHAUST <br />• <br />► I'Y <br />Cr r� 1117\ • f •"firms; <br />NEW FRONTA6ERD + - <br />HOLIDAY HEARTLAND VILLAGE <br />STATION TIRE BANK <br />MISSISSIPPI WEST REGIONAL PARK <br />NOTES: <br />Green shading denotes potential grading areas. <br />Frontage road alignments are preliminary. <br />Right-in/right-out locations on Highway 10 are preliminary. <br />Intersection controls to be determined in preliminary design. <br />MCKINLEY ST <br />BN AIL. <br />., ;er7r rrur, ,. .+ItE:�-'.<:/.lM� <br />. <C- o <br />:. <br />Via. L ./_ <br />A <br />US Highway 10/169 Importance <br />» A principal arterial carrying up to 55,000 vehicles per day (1,650 trucks) <br />» Significant commuter and freight corridor between Minneapolis — St Paul, northwestern Minnesota, and into North D <br />» Busiest BNSF rail line in MN with 57-81 freight trains and 14 transit trains per day <br />» Connection to northern Minnesota lakes and outdoor tourism industry <br />I!. !Illih <br />Ala la <br />Tmzam <br />Project Costs <br />■ Preliminary Engineer <br />Environmental DocumE <br />G.O. <br />Ramsey Blvd (CSAH 56) <br />Highway 10 and RR Grade Separation <br />$1,500,000 <br />$1,500,000 <br />Sunfish Lake Blvd (CSAH 57) <br />Highway 10 and RR Grade Separation <br />$2,500,000 <br />$2,500,000 <br />Highway 10 i a critical multimodal transportation link between <br />Minneapolis/St. Paul and Fargo <br />Cost Breakdown Notes: <br />Costs in red are already funded <br />ROW costs include funds for Right -of <br />Costs for the frontage road between <br />between the two interchange projec <br />
The URL can be used to link to this page
Your browser does not support the video tag.