My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 02/11/2020
Ramsey
>
Public
>
Minutes
>
Council
>
2020
>
Minutes - Council - 02/11/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:16:11 AM
Creation date
2/26/2020 11:12:39 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
02/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Acting Mayor Riley stated that the tight diamond option removes the most problems without <br /> creating additional problems and would be preferred if the cost could be supported. <br /> Motion by Councilmember Heinrich, seconded by Councilmember Specht, to authorize staff to <br /> explore two additional refinements to the Sunfish Lake Boulevard Interchange Layout. <br /> Motion carried. Voting Yes: Acting Mayor Riley, Councilmembers Heinrich, Specht, Kuzma, <br /> Menth, and Musgrove. Voting No: None. Absent: Mayor LeTourneau. <br /> 7.02: Authorization to Enter into a Contract for Architectural and Engineering Services <br /> for a New Public Works Facility <br /> Public Works Superintendent Riemer reviewed the staff report and recommendation to authorize <br /> staff to enter into a contract with Oertel Architects for architectural/engineering services for the <br /> new Public Works Facility, in an amount not to exceed $585,491.20, subject to the review and <br /> approval of the contract by the City Attorney. <br /> Councilmember Heinrich stated that she has visited the existing Public Works facility and asked <br /> staff to provide input on the current deficiencies. <br /> Public Works Superintendent Riemer described the deficiencies with the wash bay and storage. <br /> He stated that it is very time consuming to move equipment in order to access the needed <br /> equipment, along with having storage in multiple locations. He stated that one building also <br /> lacks floor drains, which is not good. <br /> Acting Mayor Riley asked when the Public Works office facility was "constructed". <br /> Public Works Superintendent Riemer commented that the current Public Works office is a <br /> doublewide construction trailer, which was obtained in 2005. He noted that currently the floor is <br /> half tile and half subgrade. He provided background on when the current Public Works <br /> buildings were acquired. <br /> Acting Mayor Riley commented that as it exists, the City has not constructed any Public Works <br /> buildings and has simply acquired buildings to use up to this point. <br /> Councilmember Menth recognized that there is a lot of lost time in having to move vehicles and <br /> equipment to access other vehicles and equipment. <br /> Councilmember Musgrove asked for input on the cold storage that will be provided by the <br /> existing Public Works buildings. <br /> Public Works Superintendent commented on the storage that would be made available for Parks, <br /> Police, and potentially recycling. <br /> City Council/February 11,2020 <br /> Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.