My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/24/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 02/24/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:23:31 AM
Creation date
2/26/2020 11:26:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/24/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5. 9. <br />Meeting Date: 02/24/2020 <br />By: Chris Anderson, Community <br />Development <br />Information <br />Title <br />Adopt Resolution #20-029 Approving an Easement Encroachment Agreement for Name Brand Self Storage <br />Ramsey LLC to Install and Maintain a Pylon Sign in a Drainage and Utility Easement at Lot 1, Block 1 Name <br />Brand First Addition (Project No. 19-120) <br />Purpose/Background: <br />Name Brand Self Storage Ramsey LLC (the "Applicant") received Final Plat and Site Plan approval in 2019 for the <br />construction of a new self storage facility on Lot 1, Block 1 Name Brand First Addition (the "Subject Property"). <br />Due to the location and size of drainage and utility easements (the "Easements") on the Subject Property, there is no <br />reasonable area to locate a pylon sign without encroaching into the Easements. The Applicant has requested an <br />Easement Encroachment Agreement to allow a pylon sign to be installed and maintained in the southwest corner of <br />the Subject Property. <br />Notification: <br />Notification is not required. <br />Observations/Alternatives: <br />The Applicant is proposing to construct and maintain a pylon sign that is twenty-five foot (25') tall and ninety-nine <br />(99) square feet in size (the "Sign"). Both height and square footage of the Sign comply with the sign standards for <br />the E-1 Employment District. The Sign would be located in the southwest corner of the Subject Property, <br />approximately ten (10) feet from the western and southern lot lines. The Easement in this area is much larger than <br />the typical width of ten (10) feet due to a regional storm water pond in the vicinity. However, the Engineering <br />Department has reviewed the proposed location of the Sign and determined that, as proposed, it would not impact <br />the designed function of the storm water pond. <br />Funding Source: <br />This request is being handled as part of Staffs regular duties. However, if the Easement Encroachment Agreement <br />is approved, the Applicant will be responsible for recording the document against the Subject Property, including <br />the applicable recording fee. <br />Recommendation: <br />Staff recommends approval of the Easement Encroachment Agreement. <br />Action: <br />Motion to adopt Resolution #20-029 approving an Easement Encroachment Agreement to allow the construction <br />and maintenance of a pylon sign within a drainage and utility easement on the Subject Property. <br />Site Location Map <br />Sign Details <br />Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.