Laserfiche WebLink
CITY OF RAMSEY REQUESTED NOTES: <br />1. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE <br />DATE OF LANDSCAPE ARCHITECT ACCEPTANCE WITH ALL REPLACEMEI <br />ADDITIONAL COST TO THE OWNER. THE CITY IS REQUIRING AN ADDITIONi, <br />TREES AT NO ADDITIONAL COST TO THE OWNER. <br />2. TREES SHALL NOT 5E PLANTED WITHIN THE VISION TRIANGLE AS DEFINE] <br />3. ALL TREES IN ISLANDS/CENTER MEDIAN SHALL 5E PRIVATELY MAINTAIN <br />OWNERS ASSOCIATION DOCTRINE <br />4. TOPSOIL MEETING THE CITY'S SPECIFICATION SHALL 5E REQUIRED PER <br />TICKET SHALL 5E PROVIDED AND CITY INSPECTION IS REQUIRED PRIOF <br />5. NO TOPSOIL (OR OTHER FILL) SHALL 5E PLACED WITHIN ANY WETLAND C <br />6. IRRIGATION SYSTEM SHALL 5E DESIGN BUILT 5Y THE CONTRACTOR ANt <br />PRECIPITATION HEADS, HEAD TO HEAD COVERAGE AND WEATHER CO1' <br />GENERAL NOTES: <br />1. LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON <br />GENERAL CONTRACTOR AND BY GOPHER STATE ONE CALL PRIG <br />2. COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INS1 <br />CONTRACTORS WORKING ON THE SITE. <br />3. WHERE EXISTING TREES AND/OR SIGNIFICANT SHRUB MASSINGS A' <br />SHOWN ON THE DRAWINGS OR NOT, THEY SHALL BE PROTECTED <br />REMOVED AND/OR ARE WITHIN THE GRADING LIMITS. ANY QUEST] <br />MATERIAL SHOULD OR SHOULD NOT REMAIN SHOULD BE BROUGH <br />LANDSCAPE ARCHITECT PRIOR TO REMOVAL. <br />4. ALL EXISTING TREES TO REMAIN SHALL BE FERTILIZED AND PRUNI <br />DAMAGED OR RUBBING BRANCHES. <br />5. BB TREES AND SHRUBS ARE BALLED AND BURLAPPED. <br />6. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS <br />LANDSCAPE ARCHITECT BY THE LANDSCAPE CONTRACTOR PRI( <br />QUOTATION. <br />1. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST ADDITION <br />FOR NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. <br />8. THE CONTRACTOR IS RESPONSIBLE FOR ON -GOING MAINTENANCE <br />MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF \ <br />MAY OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RES <br />9. CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE OUJI <br />10. WARRANTY FOR THE LANDSCAPE MATERIALS SHALL BEGIN ON TI <br />LANDSCAPE ARCHITECT AFTER THE COMPLETION OF PLANTING A <br />PARTIAL ACCEPTANCE WILL BE CONSIDERED. <br />11. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUG <br />