Laserfiche WebLink
Exhibit D <br />Puma Street Improvement Project <br />ALPINE DRIVE 01 <br />REMOVE EXISTING <br />ROADWAY & TRAIL <br />DEVELOPER <br />DESIGNED POND <br />PUMA STREET <br />LIFT STATION <br />LEGEND <br />ALIGN INTERSECTION <br />WITH OKAPI STREET <br />SCALE FEET <br />PROPOSED 10" SANITARY <br />SEWER OR SERVICE LINE <br />PROPOSED 16" <br />WATERMAIN OR SERVICE <br />LINE <br />PROPOSED STORM <br />SEWER <br />MANHOLE <br />HYDRANT <br />CATCH BASIN <br />10' BITUMINOUS TRAIL <br />PROPOSED STREET <br />IMPROVEMENTS <br />PHASE 2 CONSTRUCTION <br />2018 IMPROVEMENTS <br />PUMA STREET IMPROVEMENTS <br />CITY OF RAMSEY, MINNESOTA <br />FIGURE 1 <br />DECEMBER 2019 <br />17 <br />