Laserfiche WebLink
NOTE: AIM COMP Plan & Increase water heater to 45 <br />SERVICE OR LICENSE <br />SPECIAL NOTES <br />2001 <br />Adopted <br />.....................':;.. ............................................... ............................... <br />',fr t.t::11 his :; >:;:::: >:<:: >:::<::<: >:: <br />Developer contribution: <br />installation of Cobra street light <br />700.00/light <br />traditionaire subdivision street light (w /100 ft of wire) <br />500.00 /light <br />street light 0 & M 3 year a) $90 /year <br />300.00 /light <br />Residential billing: <br />unman subdivision street light rate per lot ( >7/92) <br />8.50 /quarter <br />rural subdivision street light rate per lot <br />14.00 /quarter <br />priority street light rate per residential lot <br />L20 /quarter <br />. t a itAl iiak ii 11'( <br />Residential <br />6.30 /quarter <br />Commercial <br />Based Upon Engineers Calculation <br />$25.20 /REU /qtr <br />Trunk charge /res. equivalent <br />inc. by current construction inde <br />375.00 <br />Trunk charge /acre comet. /ind. <br />inc. by current construction inde <br />3,741.00 <br />Usage Ice per I k gallons <br />1.39 <br />Minimum usage fee /qtr <br />20.85 <br />Installation of meter w /remote <br />110.00 <br />5/8" Meter with horn <br />140.00 <br />Replacement Meter Horn <br />35.00 <br />Other than 5/8" or 2" peter <br />Cost plus 15% <br />Recoimect fee <br />75.00 <br />Water Use Permit <br />50 +5525/hr staff time <br />Permit use per lk gallons <br />12.00 <br />Connection charge /res. equivalent <br />inc. by current construction inde <br />1,224.00 <br />Connection charge /acre residential <br />inc. by current construction inde <br />3,591.00 <br />Connection charge /acre comet. /ind. <br />inc. by current construction inde <br />6,581.00 <br />Lateral Benefit Charges <br />inc. by current construction inde <br />6,783.00 <br />• <br />• <br />CITY OF RAMSEY <br />2001 SCHEDULE OF RATES, FEES AND CHARGES <br />Adopted December 12, 2000 <br />