My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 04/02/2020
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2020
>
Agenda - Planning Commission - 04/02/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:04:50 AM
Creation date
3/31/2020 9:40:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
04/02/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Other Permits <br />Separate plumbing, heating and electrical permits are required for each type of work being done. <br />Inspections <br />The type of timing of inspections depend on the project and its complexity. The Building Division will specify the required <br />inspections on the yellow Inspection Card. A day's notice is required for all inspections. You must identify the permit <br />number and address to schedule an inspection. Building inspections will only be done Monday through Friday (excluding <br />holidays) from 9:00 am to 3:30 pm. Call 763-433-9850 to schedule all types of inspections. Electrical inspections will be <br />done Monday through Friday from 9:00 am to noon. All electrical questions are handled by the Contract Electrical <br />Inspector. Call 763-754-2983 between 7:00am and 8:30am. <br />Inspections Needed <br />Footing: When footing is excavated and formed or slab is formed and sand cushion and reinforcement are in <br />place but prior to placing concrete. <br />Rough -in: For any plumbing, heating or electrical work that is involved. <br />Framing: When all framing is complete, all mechanical installed and electrical rough -in inspection passed, but <br />before insulating. <br />Insulation: When all wall insulation is in place and ceiling and wall vapor barriers are in place. <br />Final: When all work is complete and before garage is occupied or used for any purpose. <br />Note: If installing a new or additional driveway, the surface material must comply with the applicable <br />zoning district, a five foot minimum side setback applies, and a driveway permit is required. The fee <br />for a driveway permit is $25. <br />
The URL can be used to link to this page
Your browser does not support the video tag.