My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 03/16/2020
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2020
>
Agenda - Environmental Policy Board - 03/16/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:00:26 AM
Creation date
4/2/2020 2:15:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
03/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Workload Tasks <br />Water Quality <br />Water Quantity <br />Natural Habitats <br />Wetlands <br />0 <br />Landowner inquiries — landowner consultation using <br />desktop analysis, literature reviews, and site <br />investigations <br />,i <br />,( <br />,( <br />,( <br />,( <br />Practice promotion — engage decision makers and <br />landowners to pursue implementation of projects <br />and activities identified in watershed plans, <br />stormwater retrofit analyses (SRAs), and other <br />plans <br />Conservation plans — prepare plans for agricultural <br />operations, water conservation, ecological <br />restoration, and backyard habitat <br />Practice design — generate detailed plan sets <br />(grading plans, planting plans, and materials <br />specifications) and cost estimates for rural and <br />urban conservation practices <br />Grant applications — conceptualize and prepare <br />grant applications <br />Project management (simple) — manage all project <br />components for projects with simple designs or <br />plans, not likely to need professional contractors <br />Project management (complex) — manage all <br />project components for projects with detailed plan <br />sets, likely to include hiring and close oversight of <br />professional contractors throughout an extended <br />installation timeline <br />,i <br />,( <br />,( <br />,( <br />,( <br />Project installation support — assist project <br />managers with all aspects of project installation <br />BMP inspections — post -construction and routine <br />inspections to document conditions and provide <br />maintenance guidance <br />N( <br />N( <br />N( <br />N( <br />N( <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.