My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/16/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 03/16/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:27:11 AM
Creation date
4/2/2020 3:12:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee <br />Meeting Date: 03/16/2020 <br />By: Tim Gladhill, Community Development <br />5. 1. <br />Title: <br />Consider Recommendation on Cost Share Alternatives for Riverdale Drive Development Initiated Expansion and <br />Safety Improvement Project <br />Purpose/Background: <br />The purpose of this case is to consider a recommendation to the City Council on acceptable funding alternatives for <br />the Riverdale Drive Development Initiated Expansion and Safety Improvement Project. <br />The need for this project is being driven by a development proposal known as Riverstone South by Capstone <br />Homes located on property owned by Pearson Properties of Ramsey on the south side of Highway 10. <br />This topic was discussed at the February 11, 2020 Work Session with the City Council and Planning Commission. <br />Consensus at that meeting was that this improvement was necessary and that a general cost -share model of an even <br />split between 1) Capstone, 2) the Future Commercial/Industrial Development between the Riverdale Extension and <br />Highway 10 and 3) the City was desired. These are very preliminary discussions, and high-level direction is sought. <br />Timeframe: <br />20 minutes. <br />Observations/Alternatives: <br />Assessment Method <br />All parties involved have verbally agreed to an even split of the assessment between Capstone's residential <br />development and the Pearson's future commercial/industrial development along Highway 10. The assumption is <br />that all parties will agree to these terms in a future Assessment Agreement that eliminates any risk and/or liability <br />from deviating from the 'net developable acreage' method of assessment used on Puma Street on the north side of <br />Highway 10. <br />City Contribution to Collector Road <br />At the February 11, 2020 Joint Work Session with the Planning Commission, consensus was that a general City <br />contribution (Municipal Contribution) was appropriate given the status as a collector road. Direction was given that <br />an approximate 33% contribution was desired. <br />A key component to the success of this project is a potential grant award from MnDOT in the amount of $710,000. <br />While Staff feels confident that this project will score well in the next application round, there is no guarantee of <br />this award. This project is listed in MnDOT and Anoka County's 2014 Highway 10 Access Planning Study. <br />A portion of the full Riverdale Drive project is located on real property owned by Anoka County. This corridor was <br />originally planned for a river crossing across the Mississippi River to the City of Dayton. At this time, Anoka <br />County does not have funding available to contribute to this project. <br />As a sidebar, the City still desires to plan for a river crossing, the alignment simply has changed to coincide with <br />Armstrong Boulevard. <br />When considering all the variables above, Staff used the following filters to arrive at our recommendation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.