My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/16/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 03/16/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:27:11 AM
Creation date
4/2/2020 3:12:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�ID <br />PERFORMANCE <br />DRIVEN DESIGN. <br />LHBcorp.com <br />November 14, 2018 <br />Mark Riverblood, <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey MN 55303 <br />sob <br />• 1(k- <br />PUMPHOUSE BUILDING IMPROVEMENT <br />PROPOSAL FOR ARCHITECTURAL DESIGN SERVICES <br />Dear Mark: <br />o‘s <br />As we have worked together on the master plan for Ramsey's park system and on the plan for The COR <br />Parks, it has become apparent how closely tied Ramsey's identity is with its unique park and open spaces. <br />We also know that even simple built forms, like the Pumphouse, can contribute to the character and utility <br />of these public spaces and are therefore excited to provide you with this proposal for its facade <br />improvements. <br />The following scope of work is for existing conditions analysis, concept design for the pumphouse, and <br />architectural design guidelines for other structures, based on the concept for the pumphouse. The <br />collaborative design team, subsequently referred to as LHB/Jacobson, will be led by LHB with Bruce <br />Jacobson providing planning context. Please review this proposal and let me know if you need any <br />modifications to our scope, schedule, or fee —we are happy to make adjustments to better meet your <br />needs. <br />SCOPE OF SERVICES <br />Project description and purpose <br />Define architectural design aesthetic for Municipal Pumphouse #3 both as a stand-alone project, and also <br />to provide a precedent model for future public realm buildings within the COR. <br />Overview and projectcontext <br />The City of Ramsey is presently in the process of design for the remaining major public realm elements in <br />The COR; the two connected park spaces —Municipal Plaza and The Waterfront. Both of these parks are <br />along or near, Center Street and across from Pumphouse #3, with the Ramsey Municipal Center at the <br />southern terminus of this same street. Center Street, as the name implies, is at the very center of Ramsey's <br />pedestrian and transit orientated downtown. The existing and future municipal buildings represent an <br />archipelago of visually and physically interconnected places within the community along this armature and <br />axis of streets, trails, sidewalks and parks —and as such, care should be taken to define and embrace this <br />sense of place through appropriate architecture. <br />Together with the Municipal Center, the Pumphouse was one of the very first buildings in the COR. <br />However, unlike the Municipal Center, an intentional decision was made to not finish the exterior, <br />preferring to do so at the time that all the public realm elements could be understood and <br />contextualized— in other words, concurrent with the aforementioned park design work now underway. <br />21 West Superior Street, Suite 500 <br />701 Washington Avenue North, Suite 200 I <br />200 Third Avenue Northeast, Suite 100 I <br />63 East Second Street, Suite 150 <br />Duluth, MN 55802 <br />Minneapolis, MN 55401 <br />Cambridge, MN 55008 <br />Superior, WI 54880 <br />218.727.8446 <br />612.338.2029 <br />763.689.4042 <br />715.392.2902 <br />
The URL can be used to link to this page
Your browser does not support the video tag.