Public Works Committee 5. 3. <br />Meeting Date: 03/16/2020 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Consider Recommendation to City Council to Accept Feasibility Report for Amended 2020 Pavement Overlay <br />Improvements, Improvement Project No. 20-02A <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider providing a recommendation to the City Council to accept the Feasibility <br />Report for the Amended 2020 Pavement Overlay Improvements, Improvement Project No. 20-02A. <br />Background: <br />On December 10, 2019, the City Council ordered Staff to prepare a Feasibility Report to explore proposed mill and <br />overlay improvements to streets in the Klemish and Flores, Sunfish Square, and Windemere Woods neighborhoods <br />in 2020 per the 2020 — 2029 Capital Improvement Program (CIP). This was designated as City Improvement <br />Project No. 20-02. In summary, the proposed improvements were not found to be feasible and cost-effective from <br />an engineering standpoint, so Staff recommended not completing such improvements in 2020. Instead, these streets <br />would be most cost-effectively maintained by reconstructing them with a full -depth reclamation project after their <br />PASER ratings fall to a rating of 3 or below. <br />On February 24, 2020, the City Council ordered a Feasibility Report for amended 2020 mill and overlay <br />improvements, designated as City Improvement Project No. 20-02A. This project proposed to complete 2-inch mill <br />and overlay improvements on all streets within Regency Pond 1st, 2nd and 3rd Additions and Business Park 95, <br />which are programmed in the 2020 — 2029 Capital Improvement Program (CIP) for mill and overlay improvements <br />in 2022 and 2024 respectively. Based on City records and observed pavement conditions, Staff felt these streets <br />would support 2-inch mill and overlay improvements in 2020. <br />WSB and Associates was enlisted to perform pavement forensics analysis on the pavement on each street segment <br />to verify that the thickness and structural capacity of the existing pavement sections would be adequate to support <br />2-inch mill and overlay improvements. Pavement cores were extracted from each street segment on March 2, 2020. <br />Unfortunately, the cores revealed that the pavement on most of the street segments is either too thin, or is in such <br />poor condition, that 2-inch mill and overlay improvements are not feasible. <br />A copy of the forensics report prepared by WSB and Associates is included in the appendix of the Feasibility <br />Report attached to this case. <br />Timeframe: <br />Staff anticipates that 20 minutes will be needed to present this case and respond to questions. <br />Observations/Alternatives: <br />Alternative # 1 — Motion to recommend that the City Council accept the Feasibility Report for Amended 2020 <br />Pavement Overlay Improvements, Improvement Project No. 20-02A. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />