Laserfiche WebLink
Prelimina~ Plat and Preliminary Site Plan Review: Ramsey Town Center 6th Addition <br />April 15, 2005 <br />Page 3 of 5 <br /> <br />10. <br /> <br />11. <br /> <br />12. <br /> <br />Continuation references and sheet overlap must be provided as discussed on previous <br />projects. These plans are the basis for the city as-built records that will be maintained for <br />future reference on utility connections. <br /> <br />Tree Preservation. A tree preservation plan was approved at the final plat stage of the <br />Ramsey Town Center Addition. There was a limited amount of trees originally located on <br />this parcel prior to development and the existing trees that did exist were removed as part of <br />the approved tree preservation plan. <br /> <br />Sidewalks. Sidewalks are shown on the public streets. The sidewalk east of building 40 <br />should be moved east to line up with the driveway. The sidewalk west of building 45 should <br />be moved west to line up with the dri,~eway. Both will p~-ovide access to 146th Avenue from <br />this project. Sidewalk must be provided from Horton 1 and Horton 4 to East Ramsey <br />Parkway. <br /> <br />Park Dedication/Trail Development: Per the Master Development Agreement, the City <br />and the Master Developer have negotiated a Park and Trail Dedication Agreement. In <br />accordance, with the Park and Trail Dedication Agreement, there are no park dedication or <br />trail development fees owed on this Ramsey Town Center 6~h Addition. <br /> <br />13. <br /> <br />14. <br /> <br />15. <br /> <br />16. <br /> <br />17. <br /> <br />Traffic Generation: As part of the Town Center AUAR, a detailed traffic analysis was <br />completed that anticipated the type and size of development shown on the plat. The proposed <br />development is consistent with .the traffic modeling system used as part of the AUAR <br />analysis. Regional road improvements to facilitate the whole Ramsey Town. Center <br />development have been agreed upon and have already begun construction. This proposed <br />development does not generate more traffic than was anticipated. <br /> <br />Preliminary Site Plan: As part of the. approval process, a detailed.site plan will be reviewed <br />as part of the development. Issues such 'as landscaping, architecture, sign placement will be <br />reviewed as part of the site plan process. It should be noted that a final site plan will need to <br />be submitted and approved along with. the final plat. <br /> <br />Stormwater Trunk Fees: The 2005 Stormwater Trunk Fee is $384.00 per unit. This fee <br />will need to be paid prior to the release of the final plat mylars. The fee in place at the time of <br />the plat being recorded is the one that will be charged. <br /> <br />Sewer and Water Trunk Fees: The 2004 Sewer and Water Trunk fees are $2,962.00 per <br />unit. These fees will need to be paid prior to the release of the final plat mylars. The fee in <br />place at the time of the plat being recorded is the one that will be charged. <br /> <br />Other Permits. The Developer is responsible for .obtaining any and all permits required <br />from other regulatory agencies. <br /> <br />44 <br /> <br /> <br />