Laserfiche WebLink
Marigold Pond <br />Sketch Plan Review <br />April 15, 2005 <br />2of3 <br /> <br />Tree Preservation Plan: The City's Tree Preservation Ordinance applies to your proposed plat. <br />A Tree Preservation plan must be part of the preliminary plat submittal, <br /> <br />Density Transition: Currently, City Code requires density' transition between the proposed <br />single-family urban lots and the surrounding single-family rural lots. Density transition <br />requirements must be incorporated into the preliminary plat submittal. <br /> <br />Wetlands: A substantial portion of the property is wetland, which wilI need to be delineated and <br />encumbered with drainage and utility easements on the preliminary and final plats. The City <br />anticipates adopting a wetland buffer ordinance in spring/summer 2005. Staff is requesting that <br />the developer give some consideration to implementing a wetland buffer where applicable <br />throughout the plat. <br /> <br />Traffic Analysis Report: The City Charter requires a traffic analysis, report for this <br />development. City Staff will utilize the services of a consultant to prepare the report and the <br />expenses incurred will be charged to the plat application escrow fund. This report must be <br />available at.the time of preliminary plat review. <br /> <br />Grading and Drainage Plans: Grading and drainage plans will need to be provided during the <br />preliminary plat process. Ponding will be required prior to discharge into public water bodies <br />such as the on-site wetlands. A permit from the Lower Rum River Water Management <br />Organization will be required. <br /> <br />Streets and Access: The sketch plan proposes one new access to Highway 47, at 160~h Ln NW <br />and to connect to !.62nd Ave NW. A stub street is proposed to the north; a temporary cul-de-sac <br />will be required in this location. Staff has sent the sketch plan to MnDOT for review and <br />comment. <br /> <br />Utilities: All lots are proposed to be served by municipal sewer and water. You have submitted a <br />request for feasibility study to determine the feasibility of providing municipal sewer and water <br />to the subject property; this' request is under consideration by the City Council, and must be <br />approved prior to the approval of this plat. <br /> <br />Park Dedication~ The sketch plan will be forwarded to the Park and Recreation Commission for <br />a recommendation on park dedication. The City has the option for land, cash or a combination <br />thereof. It is expected that a formal Park Dedication recommendation will occur at the <br />preliminary plat stage. <br /> <br />Trail Fee: Trail Fees must be paid for new lots created prior to release of the final plat for <br />recording. It should be noted that the Park and Trail Plan shows a proposed trail on the east side <br />of Highway 47. <br /> <br /> <br />