My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 04/21/2005 - Special Meeting
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2005
>
Agenda - Planning Commission - 04/21/2005 - Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:37:16 AM
Creation date
4/15/2005 1:54:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Title
Special Meeting
Document Date
04/21/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(f) configuration of wetlands on the parcel <br /> <br />(g) quality of the affected wetland(s) <br /> <br /> Subd. 3. In instances where the City approves alternative buffer standards, an <br />applicant may be required to apply extraordinary management measures to control <br />erosion, sedimentation and nutrient loading during and for two years after construction as <br />necessary. <br /> <br /> Subd. 4. Extraordinary management measures that may be permitted in <br />con:j unction with and up-slope from the above buffer strip and setback requirement <br />include, but are not limited to measures that add redUndant protections to normal required <br />Best Management Practices. <br /> <br /> Subd. 5. The applicant shall be. respOnsible to submit all of the necessary <br />infi)rmation to document that the proposed extraordinary construction and stormwater <br />management practices (hereinafter referred to as "Extraordinary Management Practices") <br />will at least duplicate the performance of the required buffers and setbacks, if not exceed <br />lt. The applicant shall also have the burden of proving that the purpose and objectives of <br />the Chapter will be met through the use of these Extraordinary Management Practices. <br /> <br /> 9.26.07 Monument Required. A permanent wetland edge and wetland <br />but'l)r tnonument shall be installed along lot lines and where needed to indicate the <br />contour of the buffer, with a maximum spacing of two hundred (200) feet of wetland <br />edge. If no butter is required, the monument shall be at the edge of the wetland. <br /> <br />9.26.08 <br /> <br />Buffer Strip Vegetation Performance Standards. <br /> <br /> Subd. 1. Where acceptable natural vegetation exists in buffer strip areas, the <br />retention of such vegetation in an undisturbed state is preferred. A buffer strip has <br />acceptable natural vegetation if it: <br /> <br /> (a) has a continuous, dense layer of perennial grasses that' have been uncultivated <br />or unbroken for at least ten (10) consecutive years, or <br /> <br /> (b) has an overstory of trees and/or shrubs with at least eighty (80) percent canopy <br />closure that have been uncultivated or unbroken for at least ten (10) consecutive years, or <br /> <br /> (c) contains a mixture of the plant communities described in (a) and (b) above, <br />that have been uncultivated or unbroken for at least ten (10) consecutive years, or <br /> <br />(d) contains listed Minnesota [nvasive Non-Native Terrestrial Plants. <br /> <br />Namsey Wetland Protection Ordinance - March 2005 Draft <br />Page 8 of 8 <br /> <br />O3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.