My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 03/24/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:44:13 PM
Creation date
4/8/2020 2:50:42 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IP 20-02A, Amended 2020 Street Overlay Improvements <br />Engineer's Estimate <br />2" Mill & Overlay <br />Regency Pond 1st, 2nd, 3rd (1.6 miles) <br />Project Pavement Area 26,081 square yards <br />ITEM MNDOT COST <br />DESCRIPTION UNfT ESTIMATED UNIT COST <br />No. No. QUANTI Y EXTENSION <br />1 2023,501 MOBILIZATION (5%) L5 1 S 20,229,08 $ 20,229,p6 <br />2 2231.604 BITUMINOUS PATCH SY 1,304 $ 20.00 $ 25.082.110 <br />4 2232.5U1 MILLBITUMIROUS PAVEMENT SY 26,081 $ 1.50 $ 39,121.510 <br />5 2357,502 BITUMINOUS MATERIAL FOR TACK COAT GAL 1,826 5 3.00 5 5.477.10 <br />C, 2360,501 TYPE SP 9.5 WEARING COURSE MIXTURE jSPWEA3400 (2,0'} TON 2,889 S 90.00 5 298.201,00 <br />7 2505.502 RESET CATCH BASIN / MANHOLE CASTING EA 31 $ 1,00040 $ 31,000,00 <br />2531.Si11 REMOVE & REPLACE CONCRETE CURB & GUTTER DESIGN LF 801 $ 50_00 $ 4tl,060 131 <br />SURMOUNTABLE <br />9 2531.604 REMOVE & REPLACE 7°' CONCRETE VALLEY GUTTER SY 33 $ 80.00 5 2,640.00 <br />10 2563,601 TRAT FIE CONTROL LS 1 $ 2,0(70,00 $ 2,000170 <br />Nan -Assessable Construction Cast $ 26,1782.06 <br />Street Construction Cost $ 367,72&fi3 <br />Storm Sewer Construction Cost $ 31,600.00 <br />Regency Pond overlay Program CnnStrurtien Cost $ 424,810,68 <br />1U%Contingency Cost $ 42,481.07 <br />Regency Pond Overlay Project Cost {t4%Indirect Cost) $ 532,712.59 <br />Totod Pra1ecl As.ertmenEs (2S% of ,Assesso6 Cost) ry 125,001,44 <br />Stormwater Utility Fund $ 29,155.50 <br />Rood Reconstruction / Querltry Fund $ 378, 555.65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.